Nyumba Ya Akiba Cement Plant — Congo, The Democratic Republic of the
Cement Plant in Congo, The Democratic Republic of the. Approximate location -5.63121, 14.20497.
Cement PlantCongo, The Democratic Republic of theCO₂ estimate (modelled)
Nyumba Ya Akiba Cement Plant is a cement plant in Congo, The Democratic Republic of the. Its listed capacity is 1,300,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Groupe Rawji. By capacity it ranks #1 among 4 cement plants in Congo, The Democratic Republic of the. It emits about 497,633 t CO₂e a year from Climate TRACE. That is 30% of the CO₂e from the 5 facilities in Congo, The Democratic Republic of the that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 6% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547316.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- India Cements Chilamakuru Cement Plant · 497,667 t CO₂e/yr · India
- Vassiliko Cement Plant · 497,723 t CO₂e/yr · Cyprus
- La Grave de Peille Cement Plant · 498,277 t CO₂e/yr · France
- Bir Mcherga Gare Cement Plant · 496,452 t CO₂e/yr · Tunisia
- Semey Cement Plant · 500,207 t CO₂e/yr · Kazakhstan
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
At 1,300,000 t of cement, Nyumba Ya Akiba Cement Plant is around the median cement plant in Congo, The Democratic Republic of the (1,090,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 497,633 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 498k t CO₂e/yr (Scope 1), Nyumba Ya Akiba Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 498k t at the EU CBAM rate (€75/t) is €37.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Congo, The Democratic Republic of the
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Groupe Rawji.
Local climate
Nyumba Ya Akiba Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 5.6°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1251 W/m² to ambient — roughly 0.96× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #1 largest of 4 cement plants in Congo, The Democratic Republic of the by listed capacity (Climate TRACE).
Nearby industrial sites
- PPC Barnet Kimpese Cement Plant · Cement Plant · 453,464 t CO₂
- Lukala Cement Plant · Cement Plant · 100,029 t CO₂
Location
Coordinates -5.63121, 14.20497. View on OpenStreetMap.
Frequently asked questions
What type of facility is Nyumba Ya Akiba Cement Plant?
Nyumba Ya Akiba Cement Plant is a cement plant in Congo, The Democratic Republic of the. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Nyumba Ya Akiba Cement Plant?
The open dataset lists 1,300,000 t of cement of capacity for Nyumba Ya Akiba Cement Plant.
How much CO₂ does Nyumba Ya Akiba Cement Plant emit?
The page uses about 497,633 t CO₂e/year from the open dataset It ranks #2 among facilities in Congo, The Democratic Republic of the by estimated CO₂.
Where is Nyumba Ya Akiba Cement Plant located?
Nyumba Ya Akiba Cement Plant is in Congo, The Democratic Republic of the at approximately -5.63121, 14.20497.
Who operates Nyumba Ya Akiba Cement Plant?
The operator recorded in the open dataset is Groupe Rawji.