Muganza Cement Plant — Rwanda
Cement Plant in Rwanda. Approximate location -2.60829, 29.01767.
Cement PlantRwandaCO₂ estimate (modelled)
Muganza Cement Plant is a cement plant in Rwanda. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Cimerwa PLC. It emits about 257,286 t CO₂e a year from Climate TRACE.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897763.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Brevik Cement Plant · 257,971 t CO₂e/yr · Norway
- Nuvoco Vistas Sonadih Cement Plant · 256,475 t CO₂e/yr · India
- Piedra Azul Cement Plant · 255,944 t CO₂e/yr · Honduras
- Kiralyegyhaza Cement Plant · 259,310 t CO₂e/yr · Hungary
- Jabal Saraj Cement Plant · 254,040 t CO₂e/yr · Afghanistan
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Rusizi II · Hydro · 44 MW · 13 km
- Ruzizi I · Hydro · 81 MW · 13 km
- Rusizi I · Hydro · 30 MW · 19 km
- Kabu · Hydro · 20 MW · 33 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 257,286 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 257k t CO₂e/yr (Scope 1), Muganza Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 257k t at the EU CBAM rate (€75/t) is €19.4M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Cimerwa PLC.
Local climate
Muganza Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 2.6°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1300 W/m² to ambient — roughly 1.00× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
Location
Coordinates -2.60829, 29.01767. View on OpenStreetMap.
Frequently asked questions
What type of facility is Muganza Cement Plant?
Muganza Cement Plant is a cement plant in Rwanda. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Muganza Cement Plant emit?
The page uses about 257,286 t CO₂e/year from the open dataset It ranks #1 among facilities in Rwanda by estimated CO₂.
Where is Muganza Cement Plant located?
Muganza Cement Plant is in Rwanda at approximately -2.60829, 29.01767.
Who operates Muganza Cement Plant?
The operator recorded in the open dataset is Cimerwa PLC.
