Mtwara Cement Plant — Tanzania
Cement Plant in Tanzania. Approximate location -10.2589, 40.04132.
Cement PlantTanzaniaCO₂ estimate (modelled)
Mtwara Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Dangote Cement PLC. It emits about 1,107,966 t CO₂e a year from Climate TRACE. That is 36% of the CO₂e from the 6 facilities in Tanzania that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897926.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Holcim Philippines Bulacan Cement Plant · 1,107,655 t CO₂e/yr · Philippines
- UltraTech Kotputli Cement Plant · 1,108,373 t CO₂e/yr · India
- Kalburgi Cement Chatarsal Cement Plant · 1,106,862 t CO₂e/yr · India
- Hume Cement Gopeng Cement Plant · 1,109,576 t CO₂e/yr · Malaysia
- Ambuja Cements Bhatapara Cement Plant · 1,111,900 t CO₂e/yr · India
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Mtwara Cement power station · Coal · 75 MW · 16 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 1,107,966 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 1.1M t CO₂e/yr (Scope 1), Mtwara Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.1M t at the EU CBAM rate (€75/t) is €83.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Dangote Cement PLC. All facilities by this operator →
Local climate
Mtwara Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 10.3°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1249 W/m² to ambient — roughly 0.96× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
Location
Coordinates -10.2589, 40.04132. View on OpenStreetMap.
Frequently asked questions
What type of facility is Mtwara Cement Plant?
Mtwara Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Mtwara Cement Plant emit?
The page uses about 1,107,966 t CO₂e/year from the open dataset It ranks #1 among facilities in Tanzania by estimated CO₂.
Where is Mtwara Cement Plant located?
Mtwara Cement Plant is in Tanzania at approximately -10.2589, 40.04132.
Who operates Mtwara Cement Plant?
The operator recorded in the open dataset is Dangote Cement PLC.
