Matutine Cement Plant — Mozambique
Cement Plant in Mozambique. Approximate location -26.39436, 32.65276.
Cement PlantMozambiqueCO₂ estimate (modelled)
Matutine Cement Plant is a cement plant in Mozambique. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Moçambique Dugongo Cimentos SA. It emits about 801,997 t CO₂e a year from Climate TRACE. That is 33% of the CO₂e from the 5 facilities in Mozambique that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547312.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Barauna Cement Plant · 801,708 t CO₂e/yr · Brazil
- Railton Cement Plant · 801,023 t CO₂e/yr · Australia
- SDIC Indonesia Manokwari Cement Plant · 798,983 t CO₂e/yr · Indonesia
- San Miguel Cement Plant · 805,530 t CO₂e/yr · Guatemala
- Nippon Steel Muroran Cement Plant · 805,980 t CO₂e/yr · Japan
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 801,997 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 802k t CO₂e/yr (Scope 1), Matutine Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 802k t at the EU CBAM rate (€75/t) is €60.4M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Moçambique Dugongo Cimentos SA.
Local climate
Matutine Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 26.4°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1281 W/m² to ambient — roughly 0.98× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Boane District · Aluminium Smelter · 189,003 t CO₂
- Maputo aluminium plant · Aluminium Smelter · 1,272,345 t CO₂
Location
Coordinates -26.39436, 32.65276. View on OpenStreetMap.
Frequently asked questions
What type of facility is Matutine Cement Plant?
Matutine Cement Plant is a cement plant in Mozambique. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Matutine Cement Plant emit?
The page uses about 801,997 t CO₂e/year from the open dataset It ranks #2 among facilities in Mozambique by estimated CO₂.
Where is Matutine Cement Plant located?
Matutine Cement Plant is in Mozambique at approximately -26.39436, 32.65276.
Who operates Matutine Cement Plant?
The operator recorded in the open dataset is Moçambique Dugongo Cimentos SA.
