Lake Cement Plant — Tanzania
Cement Plant in Tanzania. Approximate location -6.99571, 39.52248.
Cement PlantTanzaniaCO₂ estimate (modelled)
Lake Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Lake Cement Ltd. It emits about 283,849 t CO₂e a year from Climate TRACE. That is 9.3% of the CO₂e from the 6 facilities in Tanzania that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897929.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Aravansky Cement Plant · 282,578 t CO₂e/yr · Kyrgyzstan
- Nasice Cement Plant · 282,314 t CO₂e/yr · Croatia
- Thanh Cong III Kinh Môn Cement Plant · 285,556 t CO₂e/yr · Vietnam
- Alamo Concrete Cement Plant · 285,633 t CO₂e/yr · United States
- Zeal Pak Cement Hyderabad Cement Plant · 281,388 t CO₂e/yr · Pakistan
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Dar es Salaam power station · Coal · 400 MW · 34 km
- Ubungo Gas (Songas) · Gas · 208 MW · 41 km
- Kinyerezi IV power station · Gas · 330 MW · 43 km
- Kinyerezi III power station · Gas · 600 MW · 44 km
- Kinyerezi II power station · Gas · 240 MW · 44 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 283,849 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 284k t CO₂e/yr (Scope 1), Lake Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 284k t at the EU CBAM rate (€75/t) is €21.4M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Lake Cement Ltd.
Local climate
Lake Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 7.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1242 W/m² to ambient — roughly 0.95× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Tanzania Portland Dar Es Salaam Cement Plant · Cement Plant · 388,949 t CO₂
Location
Coordinates -6.99571, 39.52248. View on OpenStreetMap.
Frequently asked questions
What type of facility is Lake Cement Plant?
Lake Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Lake Cement Plant emit?
The page uses about 283,849 t CO₂e/year from the open dataset It ranks #5 among facilities in Tanzania by estimated CO₂.
Where is Lake Cement Plant located?
Lake Cement Plant is in Tanzania at approximately -6.99571, 39.52248.
Who operates Lake Cement Plant?
The operator recorded in the open dataset is Lake Cement Ltd.