Home / Africa / Morocco / Cement plants / Lafarge Settat Cement Plant 1

Lafarge Settat Cement Plant 1

Cement Plant in Morocco. Approximate location 33.05407, -7.53289.

Cement PlantMoroccoCO₂ estimate (modelled)

Lafarge Settat Cement Plant 1 is a cement plant in Morocco. Its listed capacity is 1,700,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by LafargeHolcim Maroc SA. By capacity it ranks #3 among 4 cement plants in Morocco. It emits about 519,378 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 121k passenger cars. Its CO₂ per unit of capacity is 16% below the national median for this sector.

1,700,000t of cement
519,378t CO₂e / yr (Climate TRACE)
#5CO₂ rank in Morocco
0.31t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438887.

Data status

Known source data

FacilityLafarge Settat Cement Plant 1 Climate TRACE
CountryMorocco Climate TRACE
Coordinates33.05407, -7.53289 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity1,700,000 t of cement Climate TRACE
Owner / operatorLafargeHolcim Maroc SA Climate TRACE
Modelled CO₂e519,378 t/yr Climate TRACE

Calculated from the dataset

Morocco rank#5 of 19 · top 26.3% calculated
Global cement rank#1124 of 2113 · top 53.2% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

At 1,700,000 t of cement, Lafarge Settat Cement Plant 1 is around the median cement plant in Morocco (1,750,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 519,378 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

121kcars driven for a year
68khomes' annual energy use
8.7 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 519k t CO₂e/yr (Scope 1), Lafarge Settat Cement Plant 1 carries no domestic carbon price — and as a CBAM-covered product, its 519k t at the EU CBAM rate (€75/t) is €39.1M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈10k t–26k t/yr, worth €783k€2.0M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

519k t CO₂e / yrScope 1 emissions
€39.1M/yrCBAM exposure on EU exports
10k t–26k t/yr ≈ €783k€2.0MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Morocco

Tetouan Cement Plant: 2,500,000 t of cement2.5MTetouan Ce…Meknes Cement Plant: 1,750,000 t of cement1.8MMeknes Cem…Lafarge Settat Cement Plant 1: 1,700,000 t of cement1.7MLafarge Se…Mghizrate Cement Plant: 1,300,000 t of cement1.3MMghizrate …

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by LafargeHolcim Maroc SA. All facilities by this operator →

Local climate

Lafarge Settat Cement Plant 1 sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 33.1°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
34/100environmental-severity index
12.3°Cseasonal temperature swing
70 kmdistance to coast
ModerateCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1327 W/m² to ambient — roughly 1.02× the loss at a 20 °C reference; removable insulation recovers about 1261 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #3 largest of 4 cement plants in Morocco by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 33.05407, -7.53289. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 11,000 MWh/year of recoverable heat-loss reduction and about 3,700 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Lafarge Settat Cement Plant 1?

Lafarge Settat Cement Plant 1 is a cement plant in Morocco. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Lafarge Settat Cement Plant 1?

The open dataset lists 1,700,000 t of cement of capacity for Lafarge Settat Cement Plant 1.

How much CO₂ does Lafarge Settat Cement Plant 1 emit?

The page uses about 519,378 t CO₂e/year from the open dataset It ranks #5 among facilities in Morocco by estimated CO₂.

Where is Lafarge Settat Cement Plant 1 located?

Lafarge Settat Cement Plant 1 is in Morocco at approximately 33.05407, -7.53289.

Who operates Lafarge Settat Cement Plant 1?

The operator recorded in the open dataset is LafargeHolcim Maroc SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.