Kabimba Cement Plant — Congo, The Democratic Republic of the
Cement Plant in Congo, The Democratic Republic of the. Approximate location -5.55685, 29.33907.
Cement PlantCongo, The Democratic Republic of theCO₂ estimate (modelled)
Kabimba Cement Plant is a cement plant in Congo, The Democratic Republic of the. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by West China Cement Ltd. It emits about 574,192 t CO₂e a year from Climate TRACE. That is 35% of the CO₂e from the 5 facilities in Congo, The Democratic Republic of the that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546131.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Ain Jalulah Cement Plant · 575,772 t CO₂e/yr · Tunisia
- Parasakti Cement Goli Cement Plant · 572,345 t CO₂e/yr · India
- northern Cement Sison Cement Plant · 576,943 t CO₂e/yr · Philippines
- Figuil Cement Plant · 571,416 t CO₂e/yr · Cameroon
- Martinsburg Cement Plant · 571,173 t CO₂e/yr · United States
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 574,192 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 574k t CO₂e/yr (Scope 1), Kabimba Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 574k t at the EU CBAM rate (€75/t) is €43.3M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by West China Cement Ltd. All facilities by this operator →
Local climate
Kabimba Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 5.6°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Location
Coordinates -5.55685, 29.33907. View on OpenStreetMap.
Frequently asked questions
What type of facility is Kabimba Cement Plant?
Kabimba Cement Plant is a cement plant in Congo, The Democratic Republic of the. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Kabimba Cement Plant emit?
The page uses about 574,192 t CO₂e/year from the open dataset It ranks #1 among facilities in Congo, The Democratic Republic of the by estimated CO₂.
Where is Kabimba Cement Plant located?
Kabimba Cement Plant is in Congo, The Democratic Republic of the at approximately -5.55685, 29.33907.
Who operates Kabimba Cement Plant?
The operator recorded in the open dataset is West China Cement Ltd.
