Jerez Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Holcim España SAU. It emits about 218,313 t CO₂e a year from Climate TRACE. That is 0.46% of the CO₂e from the 91 facilities in Spain that have an emissions figure in IndustryAtlas.

218,313t CO₂e / yr (Climate TRACE)
#48CO₂ rank in Spain

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896731.

Data status

Known source data

FacilityJerez Cement Plant Climate TRACE
CountrySpain Climate TRACE
Coordinates36.61843, -6.07391 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorHolcim España SAU Climate TRACE
Modelled CO₂e218,313 t/yr Climate TRACE

Calculated from the dataset

Spain rank#48 of 91 · top 52.7% calculated
Global cement rank#1814 of 2113 · top 85.8% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 218,313 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

1.2krailcars of coal burned
46khomes' electricity use for a year
218kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 218k t CO₂e/yr (Scope 1), Jerez Cement Plant carries €18.6M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.

218k t CO₂e / yrScope 1 emissions
€18.6M/yrcarbon value · full EU ETS price

Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Local climate

Jerez Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 36.6°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
42/100environmental-severity index
13.5°Cseasonal temperature swing
21 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1322 W/m² to ambient — roughly 1.02× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 36.61843, -6.07391. View on OpenStreetMap.

Frequently asked questions

What type of facility is Jerez Cement Plant?

Jerez Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does Jerez Cement Plant emit?

The page uses about 218,313 t CO₂e/year from the open dataset It ranks #48 among facilities in Spain by estimated CO₂.

Where is Jerez Cement Plant located?

Jerez Cement Plant is in Spain at approximately 36.61843, -6.07391.

Who operates Jerez Cement Plant?

The operator recorded in the open dataset is Holcim España SAU.

Built from open public data; no personal information. Operate this site? Request a correction or removal.