Jerez Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Holcim España SAU. It emits about 218,313 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 51k passenger cars.

218,313t CO₂e / yr (Climate TRACE)
#48CO₂ rank in Spain

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896731.

Data status

Known source data

FacilityJerez Cement Plant Climate TRACE
CountrySpain Climate TRACE
Coordinates36.61843, -6.07391 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorHolcim España SAU Climate TRACE
Modelled CO₂e218,313 t/yr Climate TRACE

Calculated from the dataset

Spain rank#48 of 91 · top 52.7% calculated
Global cement rank#1814 of 2113 · top 85.8% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 218,313 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

51kcars driven for a year
28khomes' annual energy use
3.6 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 218k t CO₂e/yr (Scope 1), Jerez Cement Plant carries €17.3M/yr of carbon at the full EU ETS price (€79/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈4k t–11k t/yr, worth €347k€867k, with payback up to 2 years.

218k t CO₂e / yrScope 1 emissions
€17.3M/yrcarbon value · full EU ETS price
4k t–11k t/yr ≈ €347k€867kDecarbonization potential

Carbon price: EU ETS €79/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Operator

Operated by Holcim España SAU. All facilities by this operator →

Local climate

Jerez Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 36.6°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
42/100environmental-severity index
13.5°Cseasonal temperature swing
21 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1322 W/m² to ambient — roughly 1.02× the loss at a 20 °C reference; removable insulation recovers about 1256 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 36.61843, -6.07391. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 8,400 MWh/year of recoverable heat-loss reduction and about 2,800 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

EU policy pressure on this sector

Obligation

This facility is inside the EU. For thermal equipment, insulation upgrades can support ETS exposure reduction and energy-efficiency compliance.

Sources: EU ETS, CBAM and national energy-efficiency schemes.

Frequently asked questions

What type of facility is Jerez Cement Plant?

Jerez Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does Jerez Cement Plant emit?

The page uses about 218,313 t CO₂e/year from the open dataset It ranks #48 among facilities in Spain by estimated CO₂.

Where is Jerez Cement Plant located?

Jerez Cement Plant is in Spain at approximately 36.61843, -6.07391.

Who operates Jerez Cement Plant?

The operator recorded in the open dataset is Holcim España SAU.