Galatina Cement Plant

Cement Plant in Italy. Approximate location 40.16691, 18.19823.

Cement PlantItalyCO₂ estimate (modelled)

Galatina Cement Plant is a cement plant in Italy. Its listed capacity is 1,130,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Colacem SpA. By capacity it ranks #11 among 16 cement plants in Italy. It emits about 261,752 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 61k passenger cars. Its CO₂ per unit of capacity is 36% below the national median for this sector.

1,130,000t of cement
261,752t CO₂e / yr (Climate TRACE)
#36CO₂ rank in Italy
0.23t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438764.

Data status

Known source data

FacilityGalatina Cement Plant Climate TRACE
CountryItaly Climate TRACE
Coordinates40.16691, 18.19823 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity1,130,000 t of cement Climate TRACE
Owner / operatorColacem SpA Climate TRACE
Modelled CO₂e261,752 t/yr Climate TRACE

Calculated from the dataset

Italy rank#36 of 70 · top 51.4% calculated
Global cement rank#1729 of 2113 · top 81.8% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 1,130,000 t of cement, Galatina Cement Plant is around the median cement plant in Italy (1,300,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 261,752 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

61kcars driven for a year
34khomes' annual energy use
4.4 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 262k t CO₂e/yr (Scope 1), Galatina Cement Plant carries €20.8M/yr of carbon at the full EU ETS price (€79/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈5k t–13k t/yr, worth €416k€1.0M, with payback up to 2 years.

262k t CO₂e / yrScope 1 emissions
€20.8M/yrcarbon value · full EU ETS price
5k t–13k t/yr ≈ €416k€1.0MDecarbonization potential

Carbon price: EU ETS €79/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Italy

Sesto Campano Cement Plant: 1,971,831 t of cement2.0MSesto Camp…Augusta Cement Plant: 1,900,000 t of cement1.9MAugusta Ce…Guidonia Cement Plant: 1,900,000 t of cement1.9MGuidonia C…Colacem Gubbio Cement Plant: 1,690,141 t of cement1.7MColacem Gu…Begliano Cement Plant: 1,408,451 t of cement1.4MBegliano C…Matera Cement Plant: 1,320,000 t of cement1.3MMatera Cem…Rezzato-Mazzano Cement Plant: 1,300,000 t of cement1.3MRezzato-Ma…Vernasca Cement Plant: 1,300,000 t of cement1.3MVernasca C…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Colacem SpA. All facilities by this operator →

Local climate

Galatina Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 40.2°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
47/100environmental-severity index
16.0°Cseasonal temperature swing
10 kmdistance to coast
Very highCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1334 W/m² to ambient — roughly 1.03× the loss at a 20 °C reference; removable insulation recovers about 1267 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #11 largest of 16 cement plants in Italy by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 40.16691, 18.19823. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 8,700 MWh/year of recoverable heat-loss reduction and about 3,000 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

Italy: funding & obligation

Funding. MIMIT plan (~EUR 12.7B): tax credits for efficiency/decarbonization investments (requires a certified energy diagnosis to access). official source · verified 2026
Status: Plan window/budget evolving — confirm current terms.

Obligation. Mandatory energy diagnosis every 4 yrs for large enterprises (>250 staff or >EUR 50M) and energy-intensive companies (>10 TJ/yr from 2026); ENEA penalties up to EUR 40,000. (applies as a rule above the stated threshold — we do not hold this site's metered energy use). official source · verified 2026

Programme terms verified 2026-06-18; confirm the current open phase before applying. Eligibility depends on a site's energy use / headcount, which we do not hold — not a per-facility eligibility determination.

Frequently asked questions

What type of facility is Galatina Cement Plant?

Galatina Cement Plant is a cement plant in Italy. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Galatina Cement Plant?

The open dataset lists 1,130,000 t of cement of capacity for Galatina Cement Plant.

How much CO₂ does Galatina Cement Plant emit?

The page uses about 261,752 t CO₂e/year from the open dataset It ranks #36 among facilities in Italy by estimated CO₂.

Where is Galatina Cement Plant located?

Galatina Cement Plant is in Italy at approximately 40.16691, 18.19823.

Who operates Galatina Cement Plant?

The operator recorded in the open dataset is Colacem SpA.