Dhubaya-Jumah Cement Plant is a cement plant in Saudi Arabia. Its listed capacity is 4,400,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Alsafwa Cement Co. By capacity it ranks #5 among 11 cement plants in Saudi Arabia. It emits about 1,511,593 t CO₂e a year from Climate TRACE. That is 1.8% of the CO₂e from the 47 facilities in Saudi Arabia that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 5% below the national median for this sector.

4,400,000t of cement
1,511,593t CO₂e / yr (Climate TRACE)
#26CO₂ rank in Saudi Arabia
0.34t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897771.

Data status

Known source data

FacilityDhubaya-Jumah Cement Plant Climate TRACE
CountrySaudi Arabia Climate TRACE
Coordinates22.55177, 39.43516 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity4,400,000 t of cement Climate TRACE
Owner / operatorAlsafwa Cement Co Climate TRACE
Modelled CO₂e1,511,593 t/yr Climate TRACE

Calculated from the dataset

Saudi Arabia rank#26 of 47 · top 55.3% calculated
Global cement rank#215 of 2113 · top 10.2% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 4,400,000 t of cement, Dhubaya-Jumah Cement Plant is around the median cement plant in Saudi Arabia (4,229,167 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 1,511,593 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

8.4krailcars of coal burned
352kgasoline cars driven for a year
451wind turbines running for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 1.5M t CO₂e/yr (Scope 1), Dhubaya-Jumah Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.5M t at the EU CBAM rate (€75/t) is €114M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

1.5M t CO₂e / yrScope 1 emissions
€114M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest cement plants in Saudi Arabia

Al Nabah Cement Plant: 10,000,000 t of cement10.0MAl Nabah C…Al Oyun Cement Plant: 9,700,000 t of cement9.7MAl Oyun Ce…Al Manakh Cement Plant: 7,960,000 t of cement8.0MAl Manakh …Rabigh Cement Plant: 6,000,000 t of cement6.0MRabigh Cem…Dhubaya-Jumah Cement Plant: 4,400,000 t of cement4.4MDhubaya-Ju…Al Muzahimiyah Grey Cement Plant: 4,229,167 t of cement4.2MAl Muzahim…Buraydah Cement Plant: 4,000,000 t of cement4.0MBuraydah C…Marat Cement Plant: 2,320,000 t of cement2.3MMarat Ceme…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Alsafwa Cement Co.

Local climate

Dhubaya-Jumah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 22.6°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
62/100environmental-severity index
10.9°Cseasonal temperature swing
38 kmdistance to coast
Very highCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1213 W/m² to ambient — roughly 0.93× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #5 largest of 11 cement plants in Saudi Arabia by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 22.55177, 39.43516. View on OpenStreetMap.

Frequently asked questions

What type of facility is Dhubaya-Jumah Cement Plant?

Dhubaya-Jumah Cement Plant is a cement plant in Saudi Arabia. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Dhubaya-Jumah Cement Plant?

The open dataset lists 4,400,000 t of cement of capacity for Dhubaya-Jumah Cement Plant.

How much CO₂ does Dhubaya-Jumah Cement Plant emit?

The page uses about 1,511,593 t CO₂e/year from the open dataset It ranks #26 among facilities in Saudi Arabia by estimated CO₂.

Where is Dhubaya-Jumah Cement Plant located?

Dhubaya-Jumah Cement Plant is in Saudi Arabia at approximately 22.55177, 39.43516.

Who operates Dhubaya-Jumah Cement Plant?

The operator recorded in the open dataset is Alsafwa Cement Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.