Ashaka Cement Plant is a cement plant in Nigeria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Lafarge Africa PLC. It emits about 404,790 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 94k passenger cars.

404,790t CO₂e / yr (Climate TRACE)
#14CO₂ rank in Nigeria

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897572.

Data status

Known source data

FacilityAshaka Cement Plant Climate TRACE
CountryNigeria Climate TRACE
Coordinates10.931, 11.47583 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorLafarge Africa PLC Climate TRACE
Modelled CO₂e404,790 t/yr Climate TRACE

Calculated from the dataset

Nigeria rank#14 of 25 · top 56.0% calculated
Global cement rank#1389 of 2113 · top 65.7% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 404,790 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

94kcars driven for a year
53khomes' annual energy use
6.7 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 405k t CO₂e/yr (Scope 1), Ashaka Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 405k t at the EU CBAM rate (€75/t) is €30.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈8k t–20k t/yr, worth €610k€1.5M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

405k t CO₂e / yrScope 1 emissions
€30.5M/yrCBAM exposure on EU exports
8k t–20k t/yr ≈ €610k€1.5MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Operator

Operated by Lafarge Africa PLC. All facilities by this operator →

Local climate

Ashaka Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 10.9°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Location

Coordinates 10.931, 11.47583. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 9,900 MWh/year of recoverable heat-loss reduction and about 3,400 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Ashaka Cement Plant?

Ashaka Cement Plant is a cement plant in Nigeria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does Ashaka Cement Plant emit?

The page uses about 404,790 t CO₂e/year from the open dataset It ranks #14 among facilities in Nigeria by estimated CO₂.

Where is Ashaka Cement Plant located?

Ashaka Cement Plant is in Nigeria at approximately 10.931, 11.47583.

Who operates Ashaka Cement Plant?

The operator recorded in the open dataset is Lafarge Africa PLC.