Ashaka Cement Plant — Nigeria
Cement Plant in Nigeria. Approximate location 10.931, 11.47583.
Cement PlantNigeriaCO₂ estimate (modelled)
Ashaka Cement Plant is a cement plant in Nigeria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Lafarge Africa PLC. It emits about 404,790 t CO₂e a year from Climate TRACE. That is 1.2% of the CO₂e from the 25 facilities in Nigeria that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897572.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Pennusco Cement Plant · 404,163 t CO₂e/yr · United States
- Isola del femmine Cement Plant · 406,007 t CO₂e/yr · Italy
- Namin Cement Plant · 403,439 t CO₂e/yr · Iran
- Cezarina Cement Plant · 403,259 t CO₂e/yr · Brazil
- Raveh Cement Plant · 403,229 t CO₂e/yr · Iran
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Ashaka power station · Coal · 64 MW · 7 km
- Ashaka/TPGL power station · Coal · 500 MW · 7 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 404,790 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 405k t CO₂e/yr (Scope 1), Ashaka Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 405k t at the EU CBAM rate (€75/t) is €30.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Lafarge Africa PLC. All facilities by this operator →
Local climate
Ashaka Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 10.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Location
Coordinates 10.931, 11.47583. View on OpenStreetMap.
Frequently asked questions
What type of facility is Ashaka Cement Plant?
Ashaka Cement Plant is a cement plant in Nigeria. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Ashaka Cement Plant emit?
The page uses about 404,790 t CO₂e/year from the open dataset It ranks #14 among facilities in Nigeria by estimated CO₂.
Where is Ashaka Cement Plant located?
Ashaka Cement Plant is in Nigeria at approximately 10.931, 11.47583.
Who operates Ashaka Cement Plant?
The operator recorded in the open dataset is Lafarge Africa PLC.
