Albus Cement Plant — Uzbekistan
Cement Plant in Uzbekistan. Approximate location 40.28431, 70.79179.
Cement PlantUzbekistanCO₂ estimate (modelled)
Albus Cement Plant is a cement plant in Uzbekistan. Its listed capacity is 1,410,114 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. By capacity it ranks #7 among 10 cement plants in Uzbekistan. It emits about 565,079 t CO₂e a year from Climate TRACE. That is 4.5% of the CO₂e from the 27 facilities in Uzbekistan that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 11% above the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439344.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- NCSC Dire Diwa Cement Plant · 565,960 t CO₂e/yr · Ethiopia
- Kaspi Cement Plant · 565,969 t CO₂e/yr · Georgia
- Efkarpia Cement Plant · 563,869 t CO₂e/yr · Greece
- Ilam Cement Plant · 566,518 t CO₂e/yr · Iran
- Pitimbu Cement Plant · 562,945 t CO₂e/yr · Brazil
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Shurab power station · Coal · 300 MW · 23 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 1,410,114 t of cement, Albus Cement Plant is below the median cement plant in Uzbekistan (2,496,557 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 565,079 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 565k t CO₂e/yr (Scope 1), Albus Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 565k t at the EU CBAM rate (€75/t) is €42.6M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Uzbekistan
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Local climate
Albus Cement Plant sits in a cold desert climate zone (Köppen BWk), at 40.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1356 W/m² to ambient — roughly 1.04× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #7 largest of 10 cement plants in Uzbekistan by listed capacity (Climate TRACE).
Nearby industrial sites
- Turon Eco Cement Yaypan Cement Plant · Cement Plant · 39,506 t CO₂
- Fargona Yasin Cement Plant · Cement Plant · 265,730 t CO₂
- Uzbekneftegaz Alty-Arik Refinery · Refinery · 105,629 t CO₂
- Saneg Fergana Refinery · Refinery · 423,510 t CO₂
- Kuvasaycement Cement Plant · Cement Plant · 438,992 t CO₂
- Huaxin Gayur Sugd Cement Plant · Cement Plant
Location
Coordinates 40.28431, 70.79179. View on OpenStreetMap.
Frequently asked questions
What type of facility is Albus Cement Plant?
Albus Cement Plant is a cement plant in Uzbekistan. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Albus Cement Plant?
The open dataset lists 1,410,114 t of cement of capacity for Albus Cement Plant.
How much CO₂ does Albus Cement Plant emit?
The page uses about 565,079 t CO₂e/year from the open dataset It ranks #8 among facilities in Uzbekistan by estimated CO₂.
Where is Albus Cement Plant located?
Albus Cement Plant is in Uzbekistan at approximately 40.28431, 70.79179.