Home / Africa / Nigeria / Cement plants / Sokoto Cement Plant

Sokoto Cement Plant

Cement Plant in Nigeria. Approximate location 13.05875, 5.17178.

Cement PlantNigeriaCO₂ reported

Sokoto Cement Plant is a cement plant in Nigeria with a reported capacity of 12,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by BUA International Ltd. By capacity it ranks #2 of 10 cement plants tracked in Nigeria. It emits about 4,320,860 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 1,007,193 cars.

12,500,000t of cement
4,320,860t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Nigeria
0.35t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897568.

W kontekście: jak ta instalacja się porównuje

Przy 12,500,000 t of cement, Sokoto Cement Plant jest znacznie powyżej medianę cement plant w Nigeria (7,339,667 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 5% poniżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 4,320,860 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

1,007,193cars driven for a year
563,492homes' annual energy use
72,014,333tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Nigeria

Obajana Cement Plant: 16,250,000 t of cement16.2MObajana Ce…Sokoto Cement Plant: 12,500,000 t of cement12.5MSokoto Cem…Ojibawo Cement Plant: 12,000,000 t of cement12.0MOjibawo Ce…Okpotu Cement Plant: 9,000,000 t of cement9.0MOkpotu Cem…Sagamu Cement Plant: 7,339,667 t of cement7.3MSagamu Cem…Gboko Cement Plant: 4,000,000 t of cement4.0MGboko Ceme…Ewekoro 1 Cement Plant: 3,900,000 t of cement3.9MEwekoro 1 …Ewekoro 2 Cement Plant: 2,500,000 t of cement2.5MEwekoro 2 …

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by BUA International Ltd. All facilities by this operator →

Local climate

Sokoto Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 13.1°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 10 cement plants in Nigeria by reported capacity.

Nearby industrial sites

Location

Coordinates 13.05875, 5.17178. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Sokoto Cement Plant?

Sokoto Cement Plant is a cement plant in Nigeria. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Sokoto Cement Plant?

Sokoto Cement Plant has a reported capacity of 12,500,000 t of cement.

How much CO₂ does Sokoto Cement Plant emit?

Sokoto Cement Plant emits about 4,320,860 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 1,007,193 cars. That ranks #2 among tracked facilities in Nigeria.

Where is Sokoto Cement Plant located?

Sokoto Cement Plant is in Nigeria, near coordinates 13.05875, 5.17178.

Who operates Sokoto Cement Plant?

Sokoto Cement Plant is operated by BUA International Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.