Cement Plant in Türkiye. Approximate location 41.64045, 32.30419.
Cement PlantTürkiyeCO₂ reported
Sanko Bartin Cement Plant is a cement plant in Türkiye with a reported capacity of 2,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cimko Cimento ve Beton Sanayi ve Ticaret AŞ. By capacity it ranks #17 of 57 cement plants tracked in Türkiye. It emits about 1,548,905 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 361,050 cars. Its CO₂ per unit of capacity is about 72% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439212.
Przy 2,500,000 t of cement, Sanko Bartin Cement Plant jest znacznie powyżej medianę cement plant w Türkiye (2,000,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 71% powyżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.
Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cimko Cimento ve Beton Sanayi ve Ticaret AŞ. All facilities by this operator →
Sanko Bartin Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 41.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #17 largest of 57 cement plants in Türkiye by reported capacity.
Coordinates 41.64045, 32.30419. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Sanko Bartin Cement Plant is a cement plant in Türkiye. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Sanko Bartin Cement Plant has a reported capacity of 2,500,000 t of cement.
Sanko Bartin Cement Plant emits about 1,548,905 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 361,050 cars. That ranks #15 among tracked facilities in Türkiye.
Sanko Bartin Cement Plant is in Türkiye, near coordinates 41.64045, 32.30419.
Sanko Bartin Cement Plant is operated by Cimko Cimento ve Beton Sanayi ve Ticaret AŞ.