Home / Asia / Saudi Arabia / Steel plants / Rajhi Al Assemah Steel Jeddah plant

Rajhi Al Assemah Steel Jeddah plant

Steel Plant in Saudi Arabia. Approximate location 21.28982, 39.18369.

Steel PlantSaudi ArabiaCO₂ reported

Rajhi Al Assemah Steel Jeddah plant is a steel plant in Saudi Arabia with a reported capacity of 850,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Rajhi Steel Industries Co Ltd. By capacity it ranks #5 of 6 steel plants tracked in Saudi Arabia. It emits about 180,237 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 42,013 cars. Its CO₂ per unit of capacity is about 61% below the median steel plant.

850,000t of steel
180,237t CO₂e / yr (Climate TRACE)
#49CO₂ rank in Saudi Arabia
0.21t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567044.

W kontekście: jak ta instalacja się porównuje

Przy 850,000 t of steel, Rajhi Al Assemah Steel Jeddah plant jest poniżej medianę steel plant w Saudi Arabia (1,200,000 t of steel). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 61% poniżej medianę steel plant. Podsektor: iron-and-steel. Jako steel plant, wymaga intensywnego ciepła procesowego (typowo 800–1500°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Huty stali spalają węgiel w piecach wielkich lub używają łuków elektrycznych do topienia złomu; w obu przypadkach metal w stanie płynnym musi być utrzymywany powyżej 1.500°C i przenoszony przez rozległy system gorących rur i zbiorników.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 180,237 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

42,013cars driven for a year
23,505homes' annual energy use
3,003,950tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Saudi Arabia

SABIC Hadeed Al Jubail steel plant: 6,000,000 t of steel6.0MSABIC Hade…Al Ittefaq Arab Steel Dammam plant: 2,600,000 t of steel2.6MAl Ittefaq…Solb Steel Jizan plant: 1,200,000 t of steel1.2MSolb Steel…Al Ittefaq National Steel Dammam plant: 1,000,000 t of steel1000kAl Ittefaq…Rajhi Al Assemah Steel Jeddah plant: 850,000 t of steel850kRajhi Al A…Al Qaryan steel plant: 700,000 t of steel700kAl Qaryan …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Rajhi Steel Industries Co Ltd. All facilities by this operator →

Local climate

Rajhi Al Assemah Steel Jeddah plant sits in a hot desert climate zone (Köppen BWh), at 21.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 6 steel plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 21.28982, 39.18369. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Rajhi Al Assemah Steel Jeddah plant?

Rajhi Al Assemah Steel Jeddah plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Rajhi Al Assemah Steel Jeddah plant?

Rajhi Al Assemah Steel Jeddah plant has a reported capacity of 850,000 t of steel.

How much CO₂ does Rajhi Al Assemah Steel Jeddah plant emit?

Rajhi Al Assemah Steel Jeddah plant emits about 180,237 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 42,013 cars. That ranks #49 among tracked facilities in Saudi Arabia.

Where is Rajhi Al Assemah Steel Jeddah plant located?

Rajhi Al Assemah Steel Jeddah plant is in Saudi Arabia, near coordinates 21.28982, 39.18369.

Who operates Rajhi Al Assemah Steel Jeddah plant?

Rajhi Al Assemah Steel Jeddah plant is operated by Rajhi Steel Industries Co Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.