Home / Africa / Egypt / Cement plants / National Cement El Hassana Cement Plant

National Cement El Hassana Cement Plant

Cement Plant in Egypt. Approximate location 30.70236, 33.85162.

Cement PlantEgyptCO₂ reported

National Cement El Hassana Cement Plant is a cement plant in Egypt with a reported capacity of 7,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by El Arish Cement Company SAE. By capacity it ranks #4 of 26 cement plants tracked in Egypt. It emits about 1,398,554 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 326,003 cars. Its CO₂ per unit of capacity is about 45% below the median cement plant.

7,000,000t of cement
1,398,554t CO₂e / yr (Climate TRACE)
#14CO₂ rank in Egypt
0.20t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896696.

W kontekście: jak ta instalacja się porównuje

Przy 7,000,000 t of cement, National Cement El Hassana Cement Plant jest znacznie powyżej medianę cement plant w Egypt (2,690,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 44% poniżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 1,398,554 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

326,003cars driven for a year
182,388homes' annual energy use
23,309,233tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by El Arish Cement Company SAE. All facilities by this operator →

Local climate

National Cement El Hassana Cement Plant sits in a hot desert climate zone (Köppen BWh), at 30.7°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 30.70236, 33.85162. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is National Cement El Hassana Cement Plant?

National Cement El Hassana Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of National Cement El Hassana Cement Plant?

National Cement El Hassana Cement Plant has a reported capacity of 7,000,000 t of cement.

How much CO₂ does National Cement El Hassana Cement Plant emit?

National Cement El Hassana Cement Plant emits about 1,398,554 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 326,003 cars. That ranks #14 among tracked facilities in Egypt.

Where is National Cement El Hassana Cement Plant located?

National Cement El Hassana Cement Plant is in Egypt, near coordinates 30.70236, 33.85162.

Who operates National Cement El Hassana Cement Plant?

National Cement El Hassana Cement Plant is operated by El Arish Cement Company SAE.

Built from open public data; no personal information. Operate this site? Request a correction or removal.