Cement Plant in Morocco. Approximate location 33.36726, -7.74863.
Cement PlantMoroccoCO₂ reported
Lafarge Settat Cement Plant 2 is a cement plant in Morocco with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by LafargeHolcim Maroc SA. By capacity it ranks #1 of 14 cement plants tracked in Morocco. It emits about 1,508,077 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 351,533 cars. Its CO₂ per unit of capacity is about 40% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897464.
Przy 3,000,000 t of cement, Lafarge Settat Cement Plant 2 jest znacznie powyżej medianę cement plant w Morocco (1,600,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 59% powyżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.
Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by LafargeHolcim Maroc SA. All facilities by this operator →
Lafarge Settat Cement Plant 2 sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 33.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 14 cement plants in Morocco by reported capacity.
Coordinates 33.36726, -7.74863. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Lafarge Settat Cement Plant 2 is a cement plant in Morocco. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Lafarge Settat Cement Plant 2 has a reported capacity of 3,000,000 t of cement.
Lafarge Settat Cement Plant 2 emits about 1,508,077 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 351,533 cars. That ranks #1 among tracked facilities in Morocco.
Lafarge Settat Cement Plant 2 is in Morocco, near coordinates 33.36726, -7.74863.
Lafarge Settat Cement Plant 2 is operated by LafargeHolcim Maroc SA.