Home / Europe / Austria / Cement plants / Kirchdorfer Cement Plant

Kirchdorfer Cement Plant

Cement Plant in Austria. Approximate location 47.90876, 14.11638.

Cement PlantAustriaCO₂ reported

Kirchdorfer Cement Plant is a cement plant in Austria with a reported capacity of 500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Kirchdorfer Zementwerk Hofmann GmbH. By capacity it ranks #5 of 8 cement plants tracked in Austria. It emits about 149,882 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 34,938 cars. Its CO₂ per unit of capacity is about 17% below the median cement plant.

500,000t of cement
149,882t CO₂e / yr (Climate TRACE)
#20CO₂ rank in Austria
0.30t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437240.

W kontekście: jak ta instalacja się porównuje

Przy 500,000 t of cement, Kirchdorfer Cement Plant jest około medianę cement plant w Austria (625,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 10% poniżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 149,882 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

34,938cars driven for a year
19,546homes' annual energy use
2,498,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Austria

Mannersdorf Cement Plant: 1,200,000 t of cement1.2MMannersdor…Gartenau Cement Plant: 1,100,000 t of cement1.1MGartenau C…Gmunden Cement Plant: 800,000 t of cement800kGmunden Ce…Retznei Cement Plant: 625,000 t of cement625kRetznei Ce…Kirchdorfer Cement Plant: 500,000 t of cement500kKirchdorfe…Wopfinger Cement Plant: 500,000 t of cement500kWopfinger …Wietersdorf Cement Plant: 500,000 t of cement500kWietersdor…Vils Cement Plant: 300,000 t of cement300kVils Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Kirchdorfer Zementwerk Hofmann GmbH. All facilities by this operator →

Local climate

Kirchdorfer Cement Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 47.9°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 8 cement plants in Austria by reported capacity.

Nearby industrial sites

Location

Coordinates 47.90876, 14.11638. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Kirchdorfer Cement Plant?

Kirchdorfer Cement Plant is a cement plant in Austria. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Kirchdorfer Cement Plant?

Kirchdorfer Cement Plant has a reported capacity of 500,000 t of cement.

How much CO₂ does Kirchdorfer Cement Plant emit?

Kirchdorfer Cement Plant emits about 149,882 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 34,938 cars. That ranks #20 among tracked facilities in Austria.

Where is Kirchdorfer Cement Plant located?

Kirchdorfer Cement Plant is in Austria, near coordinates 47.90876, 14.11638.

Who operates Kirchdorfer Cement Plant?

Kirchdorfer Cement Plant is operated by Kirchdorfer Zementwerk Hofmann GmbH.

Built from open public data; no personal information. Operate this site? Request a correction or removal.