Home / South America / Brazil / Cement plants / Bodoquena Cement Plant

Bodoquena Cement Plant

Cement Plant in Brazil. Approximate location -20.47353, -56.72973.

Cement PlantBrazilCO₂ reported

Bodoquena Cement Plant is a cement plant in Brazil with a reported capacity of 800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by InterCement Brasil SA. By capacity it ranks #42 of 57 cement plants tracked in Brazil. It emits about 391,614 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 91,285 cars. Its CO₂ per unit of capacity is about 36% above the median cement plant.

800,000t of cement
391,614t CO₂e / yr (Climate TRACE)
#75CO₂ rank in Brazil
0.49t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895270.

W kontekście: jak ta instalacja się porównuje

Przy 800,000 t of cement, Bodoquena Cement Plant jest poniżej medianę cement plant w Brazil (1,461,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 50% powyżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 391,614 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

91,285cars driven for a year
51,071homes' annual energy use
6,526,900tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Brazil

Rio Branco do Sul Cement Plant: 7,000,000 t of cement7.0MRio Branco…Lagoa Santa Cement Plant: 4,900,000 t of cement4.9MLagoa Sant…Salto de Pirapora Cement Plant: 4,800,000 t of cement4.8MSalto de P…Ciplam Sobradinho Cement Plant: 3,800,000 t of cement3.8MCiplam Sob…Carandaí Cement Plant: 3,400,000 t of cement3.4MCarandaí C…Barroso Cement Plant: 3,200,000 t of cement3.2MBarroso Ce…Apiai Cement Plant: 3,200,000 t of cement3.2MApiai Ceme…Balsa nova Cement Plant: 2,800,000 t of cement2.8MBalsa nova…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by InterCement Brasil SA. All facilities by this operator →

Local climate

Bodoquena Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 20.5°S in the southern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #42 largest of 57 cement plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -20.47353, -56.72973. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Bodoquena Cement Plant?

Bodoquena Cement Plant is a cement plant in Brazil. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Bodoquena Cement Plant?

Bodoquena Cement Plant has a reported capacity of 800,000 t of cement.

How much CO₂ does Bodoquena Cement Plant emit?

Bodoquena Cement Plant emits about 391,614 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 91,285 cars. That ranks #75 among tracked facilities in Brazil.

Where is Bodoquena Cement Plant located?

Bodoquena Cement Plant is in Brazil, near coordinates -20.47353, -56.72973.

Who operates Bodoquena Cement Plant?

Bodoquena Cement Plant is operated by InterCement Brasil SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.