Home / Africa / Sudan / Cement plants / Berber Cement Plant

Berber Cement Plant

Cement Plant in Sudan. Approximate location 17.93887, 34.04628.

Cement PlantSudanCO₂ reported

Berber Cement Plant is a cement plant in Sudan with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Berber Cement Co Ltd. By capacity it ranks #5 of 6 cement plants tracked in Sudan. It emits about 645,266 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 150,412 cars. Its CO₂ per unit of capacity is about 19% above the median cement plant.

1,500,000t of cement
645,266t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Sudan
0.43t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897787.

W kontekście: jak ta instalacja się porównuje

Przy 1,500,000 t of cement, Berber Cement Plant jest około medianę cement plant w Sudan (1,700,000 t of cement). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 28% powyżej medianę cement plant. Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 645,266 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

150,412cars driven for a year
84,150homes' annual energy use
10,754,433tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Sudan

Mass Group Ad Damar Cement Plant: 2,000,000 t of cement2.0MMass Group…Salam Ad Damar Cement Plant: 2,000,000 t of cement2.0MSalam Ad D…Atbara Cement Plant: 1,700,000 t of cement1.7MAtbara Cem…Abu Saffar Cement Plant: 1,600,000 t of cement1.6MAbu Saffar…Berber Cement Plant: 1,500,000 t of cement1.5MBerber Cem…Rabak Cement Plant: 1,000,000 t of cement1000kRabak Ceme…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Berber Cement Co Ltd. All facilities by this operator →

Local climate

Berber Cement Plant sits in a hot desert climate zone (Köppen BWh), at 17.9°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 6 cement plants in Sudan by reported capacity.

Nearby industrial sites

Location

Coordinates 17.93887, 34.04628. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Berber Cement Plant?

Berber Cement Plant is a cement plant in Sudan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Berber Cement Plant?

Berber Cement Plant has a reported capacity of 1,500,000 t of cement.

How much CO₂ does Berber Cement Plant emit?

Berber Cement Plant emits about 645,266 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 150,412 cars. That ranks #1 among tracked facilities in Sudan.

Where is Berber Cement Plant located?

Berber Cement Plant is in Sudan, near coordinates 17.93887, 34.04628.

Who operates Berber Cement Plant?

Berber Cement Plant is operated by Berber Cement Co Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.