Lime Plant in Canada. Approximate location 43.0687, -80.858.
Lime PlantCanadaCO₂ reported
Beachville Operation is a lime plant in Canada with a reported capacity of 679,628 t of lime. It calcines limestone into quicklime in high-temperature kilns. By capacity it ranks #3 of 11 lime plants tracked in Canada. It emits about 382,459 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 89,151 cars. Its CO₂ per unit of capacity is about 15% below the median lime plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38467325.
Przy 679,628 t of lime, Beachville Operation jest znacznie powyżej medianę lime plant w Canada (231,971 t of lime). Podsektor: lime. Jako lime plant, wymaga intensywnego ciepła procesowego (typowo 600–900°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Huty wapienne kalcynują wapień w gorących piecach w temperaturze 800–900°C, a gorący wapień żywy musi być obsługiwany w izolowanych zbiornikach, aby uniknąć reaktywności z wilgocią.
Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of lime), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Beachville Operation sits in a warm-summer humid continental climate zone (Köppen Dfb), at 43.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 11 lime plants in Canada by reported capacity.
Coordinates 43.0687, -80.858. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Beachville Operation is a lime plant in Canada. It calcines limestone into quicklime in high-temperature kilns.
Beachville Operation has a reported capacity of 679,628 t of lime.
Beachville Operation emits about 382,459 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 89,151 cars. That ranks #49 among tracked facilities in Canada.
Beachville Operation is in Canada, near coordinates 43.0687, -80.858.