Home / Europe / Poland / Steel plants / ArcelorMittal Warszawa steel plant

ArcelorMittal Warszawa steel plant

Steel Plant in Poland. Approximate location 52.29727, 20.92562.

Steel PlantPolandCO₂ reported

ArcelorMittal Warszawa steel plant is a steel plant in Poland with a reported capacity of 750,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Arcelormittal Warszawa SP zoo. By capacity it ranks #5 of 6 steel plants tracked in Poland. It emits about 63,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,830 cars. Its CO₂ per unit of capacity is about 84% below the median steel plant.

750,000t of steel
63,619t CO₂e / yr (Climate TRACE)
#27CO₂ rank in Poland
0.08t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567006.

W kontekście: jak ta instalacja się porównuje

Przy 750,000 t of steel, ArcelorMittal Warszawa steel plant jest około medianę steel plant w Poland (900,000 t of steel). Podsektor: iron-and-steel. Jako steel plant, wymaga intensywnego ciepła procesowego (typowo 800–1500°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Huty stali spalają węgiel w piecach wielkich lub używają łuków elektrycznych do topienia złomu; w obu przypadkach metal w stanie płynnym musi być utrzymywany powyżej 1.500°C i przenoszony przez rozległy system gorących rur i zbiorników.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 63,619 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

14,830cars driven for a year
8,297homes' annual energy use
1,060,317tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Poland

ArcelorMittal Dąbrowa Górnicza steel plant: 5,001,000 t of steel5.0MArcelorMit…CMC Zawiercie steel plant: 1,700,000 t of steel1.7MCMC Zawier…Celsa Huta Ostrowiec steel plant: 900,000 t of steel900kCelsa Huta…Huta Czestochowa steel plant: 840,000 t of steel840kHuta Czest…ArcelorMittal Warszawa steel plant: 750,000 t of steel750kArcelorMit…Ferrostal Labedy Gliwice steel plant: 500,000 t of steel500kFerrostal …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Arcelormittal Warszawa SP zoo. All facilities by this operator →

Local climate

ArcelorMittal Warszawa steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 52.3°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 6 steel plants in Poland by reported capacity.

Nearby industrial sites

Location

Coordinates 52.29727, 20.92562. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is ArcelorMittal Warszawa steel plant?

ArcelorMittal Warszawa steel plant is a steel plant in Poland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of ArcelorMittal Warszawa steel plant?

ArcelorMittal Warszawa steel plant has a reported capacity of 750,000 t of steel.

How much CO₂ does ArcelorMittal Warszawa steel plant emit?

ArcelorMittal Warszawa steel plant emits about 63,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,830 cars. That ranks #27 among tracked facilities in Poland.

Where is ArcelorMittal Warszawa steel plant located?

ArcelorMittal Warszawa steel plant is in Poland, near coordinates 52.29727, 20.92562.

Who operates ArcelorMittal Warszawa steel plant?

ArcelorMittal Warszawa steel plant is operated by Arcelormittal Warszawa SP zoo.

Built from open public data; no personal information. Operate this site? Request a correction or removal.