Home / Asia / Uzbekistan / Cement plants / AMMC Sherabad Cement Plant

AMMC Sherabad Cement Plant

Cement Plant in Uzbekistan. Approximate location 37.67062, 66.63375.

Cement PlantUzbekistanCO₂ reported

AMMC Sherabad Cement Plant is a cement plant in Uzbekistan with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Almalyk Mining and Metallurgical Complex JSC. By capacity it ranks #7 of 18 cement plants tracked in Uzbekistan. It emits about 592,590 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 138,133 cars. Its CO₂ per unit of capacity is about 10% above the median cement plant.

1,500,000t of cement
592,590t CO₂e / yr (Climate TRACE)
#7CO₂ rank in Uzbekistan
0.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547408.

W kontekście: jak ta instalacja się porównuje

Przy 1,500,000 t of cement, AMMC Sherabad Cement Plant jest około medianę cement plant w Uzbekistan (1,400,000 t of cement). Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 592,590 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

138,133cars driven for a year
77,281homes' annual energy use
9,876,500tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Uzbekistan

Qizilqumsement Cement Plant: 3,600,000 t of cement3.6MQizilqumse…Tashkent Conch Cement Plant: 2,500,000 t of cement2.5MTashkent C…Akhangaran Cement Plant: 2,500,000 t of cement2.5MAkhangaran…AWCC Andijon Cement Plant: 2,496,557 t of cement2.5MAWCC Andij…Andijan Conch Cement Plant: 2,496,557 t of cement2.5MAndijan Co…Huaxin Cement Jizzakh Cement Plant: 1,660,000 t of cement1.7MHuaxin Cem…AMMC Sherabad Cement Plant: 1,500,000 t of cement1.5MAMMC Shera…Albus Cement Plant: 1,410,114 t of cement1.4MAlbus Ceme…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Almalyk Mining and Metallurgical Complex JSC. All facilities by this operator →

Local climate

AMMC Sherabad Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 37.7°N in the northern hemisphere.

~10°Ctypical annual mean
~23°Ctypical warm-season
Cold semi-arid steppe: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #7 largest of 18 cement plants in Uzbekistan by reported capacity.

Nearby industrial sites

Location

Coordinates 37.67062, 66.63375. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is AMMC Sherabad Cement Plant?

AMMC Sherabad Cement Plant is a cement plant in Uzbekistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of AMMC Sherabad Cement Plant?

AMMC Sherabad Cement Plant has a reported capacity of 1,500,000 t of cement.

How much CO₂ does AMMC Sherabad Cement Plant emit?

AMMC Sherabad Cement Plant emits about 592,590 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 138,133 cars. That ranks #7 among tracked facilities in Uzbekistan.

Where is AMMC Sherabad Cement Plant located?

AMMC Sherabad Cement Plant is in Uzbekistan, near coordinates 37.67062, 66.63375.

Who operates AMMC Sherabad Cement Plant?

AMMC Sherabad Cement Plant is operated by Almalyk Mining and Metallurgical Complex JSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.