Home / Asia / Saudi Arabia / Steel plants / Al Qaryan steel plant

Al Qaryan steel plant

Steel Plant in Saudi Arabia. Approximate location 26.28253, 49.95605.

Steel PlantSaudi ArabiaCO₂ reported

Al Qaryan steel plant is a steel plant in Saudi Arabia with a reported capacity of 700,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). By capacity it ranks #6 of 6 steel plants tracked in Saudi Arabia. It emits about 910,474 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 212,232 cars. Its CO₂ per unit of capacity is about 141% above the median steel plant.

700,000t of steel
910,474t CO₂e / yr (Climate TRACE)
#38CO₂ rank in Saudi Arabia
1.30t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42741845.

W kontekście: jak ta instalacja się porównuje

Przy 700,000 t of steel, Al Qaryan steel plant jest poniżej medianę steel plant w Saudi Arabia (1,200,000 t of steel). Jego CO₂ na jednostkę pojemności wynosi w przybliżeniu 138% powyżej medianę steel plant. Podsektor: iron-and-steel. Jako steel plant, wymaga intensywnego ciepła procesowego (typowo 800–1500°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Huty stali spalają węgiel w piecach wielkich lub używają łuków elektrycznych do topienia złomu; w obu przypadkach metal w stanie płynnym musi być utrzymywany powyżej 1.500°C i przenoszony przez rozległy system gorących rur i zbiorników.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 910,474 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

212,232cars driven for a year
118,737homes' annual energy use
15,174,567tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Saudi Arabia

SABIC Hadeed Al Jubail steel plant: 6,000,000 t of steel6.0MSABIC Hade…Al Ittefaq Arab Steel Dammam plant: 2,600,000 t of steel2.6MAl Ittefaq…Solb Steel Jizan plant: 1,200,000 t of steel1.2MSolb Steel…Al Ittefaq National Steel Dammam plant: 1,000,000 t of steel1000kAl Ittefaq…Rajhi Al Assemah Steel Jeddah plant: 850,000 t of steel850kRajhi Al A…Al Qaryan steel plant: 700,000 t of steel700kAl Qaryan …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Al Qaryan steel plant sits in a hot desert climate zone (Köppen BWh), at 26.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 6 steel plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 26.28253, 49.95605. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Al Qaryan steel plant?

Al Qaryan steel plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Al Qaryan steel plant?

Al Qaryan steel plant has a reported capacity of 700,000 t of steel.

How much CO₂ does Al Qaryan steel plant emit?

Al Qaryan steel plant emits about 910,474 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 212,232 cars. That ranks #38 among tracked facilities in Saudi Arabia.

Where is Al Qaryan steel plant located?

Al Qaryan steel plant is in Saudi Arabia, near coordinates 26.28253, 49.95605.

Built from open public data; no personal information. Operate this site? Request a correction or removal.