Cement Plant in Saudi Arabia. Approximate location 21.91645, 41.26155.
Cement PlantSaudi ArabiaCO₂ reported
Al Muwiyah Cement Plant is a cement plant in Saudi Arabia with a reported capacity of 1,980,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Umm Al Qura Cement SJSC. By capacity it ranks #17 of 19 cement plants tracked in Saudi Arabia. It emits about 692,596 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 161,444 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42547388.
Przy 1,980,000 t of cement, Al Muwiyah Cement Plant jest poniżej medianę cement plant w Saudi Arabia (4,000,000 t of cement). Podsektor: cement. Jako cement plant, wymaga intensywnego ciepła procesowego (typowo 800–1400°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Cementownie ogrzewają wapień do 1.400°C w piecach obracających się — jeden z najgorętszych procesów przemysłowych — i muszą precyzyjnie kontrolować temperaturę na całej długości pieca.
Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Umm Al Qura Cement SJSC. All facilities by this operator →
Al Muwiyah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 21.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #17 largest of 19 cement plants in Saudi Arabia by reported capacity.
Coordinates 21.91645, 41.26155. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Muwiyah Cement Plant is a cement plant in Saudi Arabia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Muwiyah Cement Plant has a reported capacity of 1,980,000 t of cement.
Al Muwiyah Cement Plant emits about 692,596 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 161,444 cars. That ranks #41 among tracked facilities in Saudi Arabia.
Al Muwiyah Cement Plant is in Saudi Arabia, near coordinates 21.91645, 41.26155.
Al Muwiyah Cement Plant is operated by Umm Al Qura Cement SJSC.