Home / Africa / Egypt / Steel plants / Al-Ezz Dekheila Steel Alexandria plant

Al-Ezz Dekheila Steel Alexandria plant

Steel Plant in Egypt. Approximate location 31.11972, 29.80666.

Steel PlantEgyptCO₂ reported

Al-Ezz Dekheila Steel Alexandria plant is a steel plant in Egypt with a reported capacity of 3,200,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Al Ezz Dekheila Steel Company Alexandria SAE. By capacity it ranks #2 of 11 steel plants tracked in Egypt. It emits about 1,687,985 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 393,470 cars.

3,200,000t of steel
1,687,985t CO₂e / yr (Climate TRACE)
#12CO₂ rank in Egypt
0.53t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566794.

W kontekście: jak ta instalacja się porównuje

Przy 3,200,000 t of steel, Al-Ezz Dekheila Steel Alexandria plant jest znacznie powyżej medianę steel plant w Egypt (1,200,000 t of steel). Podsektor: iron-and-steel. Jako steel plant, wymaga intensywnego ciepła procesowego (typowo 800–1500°C) do swoich głównych operacji przemysłowych — ciepła, które musi być dostarczane przez kotły, piece lub spalanie bezpośrednie, a straty przez nieisolowane zbiorniki i rury stanowią zmarnowane paliwo. Modułowa izolacja demontowalna może zmniejszyć te straty o 80–96%, chłodząc powierzchnie do ≤45°C, z zwrotem inwestycji często poniżej 2 lat. Huty stali spalają węgiel w piecach wielkich lub używają łuków elektrycznych do topienia złomu; w obu przypadkach metal w stanie płynnym musi być utrzymywany powyżej 1.500°C i przenoszony przez rozległy system gorących rur i zbiorników.

Porównanie pojemności i intensywności CO₂ obliczane na podstawie danych instalacji przemysłowych Climate TRACE; rola sektora oparta na odniesieniau inżynierskim.

What 1,687,985 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

393,470cars driven for a year
220,134homes' annual energy use
28,133,083tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Egypt

Ezz Flat Steel Ain Sokhna plant: 3,900,000 t of steel3.9MEzz Flat S…Al-Ezz Dekheila Steel Alexandria plant: 3,200,000 t of steel3.2MAl-Ezz Dek…Egyptian Sponge Iron and Steel Company Sadat City plant: 3,000,000 t of steel3.0MEgyptian S…Suez Steel Solb Misr Attaka plant: 2,100,000 t of steel2.1MSuez Steel…Egyptian American Steel Rolling Company Sadat City plant: 1,200,000 t of steel1.2MEgyptian A…Ezz Steel Rebar Sadat City plant: 1,000,000 t of steel1000kEzz Steel …Egyptian Steel Beni Suef plant: 600,000 t of steel600kEgyptian S…Egyptian Steel Ain Sokhna plant: 600,000 t of steel600kEgyptian S…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Al Ezz Dekheila Steel Company Alexandria SAE. All facilities by this operator →

Local climate

Al-Ezz Dekheila Steel Alexandria plant sits in a hot desert climate zone (Köppen BWh), at 31.1°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 11 steel plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 31.11972, 29.80666. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Al-Ezz Dekheila Steel Alexandria plant?

Al-Ezz Dekheila Steel Alexandria plant is a steel plant in Egypt. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Al-Ezz Dekheila Steel Alexandria plant?

Al-Ezz Dekheila Steel Alexandria plant has a reported capacity of 3,200,000 t of steel.

How much CO₂ does Al-Ezz Dekheila Steel Alexandria plant emit?

Al-Ezz Dekheila Steel Alexandria plant emits about 1,687,985 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 393,470 cars. That ranks #12 among tracked facilities in Egypt.

Where is Al-Ezz Dekheila Steel Alexandria plant located?

Al-Ezz Dekheila Steel Alexandria plant is in Egypt, near coordinates 31.11972, 29.80666.

Who operates Al-Ezz Dekheila Steel Alexandria plant?

Al-Ezz Dekheila Steel Alexandria plant is operated by Al Ezz Dekheila Steel Company Alexandria SAE.

Built from open public data; no personal information. Operate this site? Request a correction or removal.