Lime Plant in China. Approximate location 35.50369, 112.92507.
Lime PlantChinaCO₂ reported
Ze County Dongde Building Materials Factory. is a lime plant in China with a reported capacity of 409,811 t of lime. It calcines limestone into quicklime in high-temperature kilns. By capacity it ranks #807 of 1,349 lime plants tracked in China. It emits about 269,847 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 62,901 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38467442.
409,811 t of limeで、Ze County Dongde Building Materials Factory.はChinaのlime plantの中央値約 409,811 t of limeです。 サブセクター:lime。 lime plantとして、その中核的な産業操業に対して激しいプロセス熱(通常600–900°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 石灰工場は800~900°Cの高温キルンでセメント石を焙焼し、高温の生石灰は、水分との反応を防ぐために断熱容器で取り扱う必要があります。
容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of lime), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Ze County Dongde Building Materials Factory. sits in a monsoon hot-summer continental climate zone (Köppen Dwa), at 35.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #807 largest of 1349 lime plants in China by reported capacity.
Coordinates 35.50369, 112.92507. View on OpenStreetMap.
A lime plant like this runs hot equipment that sheds heat continuously: kiln, preheater, hot-gas ducting, valves & dampers (surface/process temperatures around 200–900 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.
calcination-heavy like cement; fuel side only.
On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 9,000 MWh/yr (≈ 3,100 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.
See Inzonex insulation → Estimate your site →
Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.
Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.
Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:
CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.
Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.
Ze County Dongde Building Materials Factory. is a lime plant in China. It calcines limestone into quicklime in high-temperature kilns.
Ze County Dongde Building Materials Factory. has a reported capacity of 409,811 t of lime.
Ze County Dongde Building Materials Factory. emits about 269,847 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 62,901 cars. That ranks #1782 among tracked facilities in China.
Ze County Dongde Building Materials Factory. is in China, near coordinates 35.50369, 112.92507.