Home / Asia / Indonesia / Steel plants / Jakarta Prima Steel Industries plant

Jakarta Prima Steel Industries plant

Steel Plant in Indonesia. Approximate location -6.17922, 106.92371.

Steel PlantIndonesiaCO₂ reported

Jakarta Prima Steel Industries plant is a steel plant in Indonesia with a reported capacity of 900,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by PT Jakarta Prima Steel Industries. By capacity it ranks #7 of 8 steel plants tracked in Indonesia. It emits about 163,561 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 38,126 cars. Its CO₂ per unit of capacity is about 66% below the median steel plant.

900,000t of steel
163,561t CO₂e / yr (Climate TRACE)
#56CO₂ rank in Indonesia
0.18t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566835.

文脈内で:この施設がどのように比較されるか

900,000 t of steelで、Jakarta Prima Steel Industries plantはIndonesiaのsteel plantの中央値以下 2,800,000 t of steelです。 容量あたりのCO₂は、steel plantの中央値下約71%です。 サブセクター:iron-and-steel。 steel plantとして、その中核的な産業操業に対して激しいプロセス熱(通常800–1500°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 製鉄所は高炉で石炭を燃焼させるか、電気アークを使用してスクラップを溶融します。どちらの場合でも溶融金属は1,500°C以上に保つ必要があり、広範な高温配管および容器を通じて転送されます。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 163,561 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

38,126cars driven for a year
21,330homes' annual energy use
2,726,017tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Indonesia

Dexin Steel Morowali plant: 7,000,000 t of steel7.0MDexin Stee…Krakatau Steel Cilegon plant: 4,000,000 t of steel4.0MKrakatau S…KS Posco Cilegon steel plant: 3,000,000 t of steel3.0MKS Posco C…Gunung Raja Paksi West Java steel plant: 2,800,000 t of steel2.8MGunung Raj…Master Steel Jakarta Steel plant: 1,500,000 t of steel1.5MMaster Ste…CNR Mandan Steel South Kalimantan plant: 1,000,000 t of steel1000kCNR Mandan…Jakarta Prima Steel Industries plant: 900,000 t of steel900kJakarta Pr…PT Ispat Indo steel plant: 650,000 t of steel650kPT Ispat I…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by PT Jakarta Prima Steel Industries. All facilities by this operator →

Local climate

Jakarta Prima Steel Industries plant sits in a tropical rainforest climate zone (Köppen Af), at 6.2°S in the southern hemisphere.

~26°Ctypical annual mean
~27°Ctypical warm-season
Tropical rainforest: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #7 largest of 8 steel plants in Indonesia by reported capacity.

Nearby industrial sites

Location

Coordinates -6.17922, 106.92371. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Jakarta Prima Steel Industries plant?

Jakarta Prima Steel Industries plant is a steel plant in Indonesia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Jakarta Prima Steel Industries plant?

Jakarta Prima Steel Industries plant has a reported capacity of 900,000 t of steel.

How much CO₂ does Jakarta Prima Steel Industries plant emit?

Jakarta Prima Steel Industries plant emits about 163,561 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 38,126 cars. That ranks #56 among tracked facilities in Indonesia.

Where is Jakarta Prima Steel Industries plant located?

Jakarta Prima Steel Industries plant is in Indonesia, near coordinates -6.17922, 106.92371.

Who operates Jakarta Prima Steel Industries plant?

Jakarta Prima Steel Industries plant is operated by PT Jakarta Prima Steel Industries.

Built from open public data; no personal information. Operate this site? Request a correction or removal.