Home / Europe / Serbia / Steel plants / HBIS GROUP Serbia Iron & Steel plant Belgrade

HBIS GROUP Serbia Iron & Steel plant Belgrade

Steel Plant in Serbia. Approximate location 44.60721, 20.96847.

Steel PlantSerbiaCO₂ reported

HBIS GROUP Serbia Iron & Steel plant Belgrade is a steel plant in Serbia with a reported capacity of 2,199,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by HBIS Group Serbia Iron & Steel Beograd doo. By capacity it ranks #1 of 2 steel plants tracked in Serbia. It emits about 2,052,057 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 478,335 cars. Its CO₂ per unit of capacity is about 73% above the median steel plant.

2,199,000t of steel
2,052,057t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Serbia
0.93t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567013.

文脈内で:この施設がどのように比較されるか

2,199,000 t of steelで、HBIS GROUP Serbia Iron & Steel plant BelgradeはSerbiaのsteel plantの中央値約 2,199,000 t of steelです。 サブセクター:iron-and-steel。 steel plantとして、その中核的な産業操業に対して激しいプロセス熱(通常800–1500°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 製鉄所は高炉で石炭を燃焼させるか、電気アークを使用してスクラップを溶融します。どちらの場合でも溶融金属は1,500°C以上に保つ必要があり、広範な高温配管および容器を通じて転送されます。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 2,052,057 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

478,335cars driven for a year
267,613homes' annual energy use
34,200,950tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Serbia

HBIS GROUP Serbia Iron & Steel plant Belgrade: 2,199,000 t of steel2.2MHBIS GROUP…Metalfer Steel Mill Sremska Mitrovica: 500,000 t of steel500kMetalfer S…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by HBIS Group Serbia Iron & Steel Beograd doo. All facilities by this operator →

Local climate

HBIS GROUP Serbia Iron & Steel plant Belgrade sits in a humid subtropical climate zone (Köppen Cfa), at 44.6°N in the northern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 2 steel plants in Serbia by reported capacity.

Nearby industrial sites

Location

Coordinates 44.60721, 20.96847. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is HBIS GROUP Serbia Iron & Steel plant Belgrade?

HBIS GROUP Serbia Iron & Steel plant Belgrade is a steel plant in Serbia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of HBIS GROUP Serbia Iron & Steel plant Belgrade?

HBIS GROUP Serbia Iron & Steel plant Belgrade has a reported capacity of 2,199,000 t of steel.

How much CO₂ does HBIS GROUP Serbia Iron & Steel plant Belgrade emit?

HBIS GROUP Serbia Iron & Steel plant Belgrade emits about 2,052,057 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 478,335 cars. That ranks #1 among tracked facilities in Serbia.

Where is HBIS GROUP Serbia Iron & Steel plant Belgrade located?

HBIS GROUP Serbia Iron & Steel plant Belgrade is in Serbia, near coordinates 44.60721, 20.96847.

Who operates HBIS GROUP Serbia Iron & Steel plant Belgrade?

HBIS GROUP Serbia Iron & Steel plant Belgrade is operated by HBIS Group Serbia Iron & Steel Beograd doo.

Built from open public data; no personal information. Operate this site? Request a correction or removal.