Home / South America / Brazil / Steel plants / Gerdau Pindamonhangaba steel plant

Gerdau Pindamonhangaba steel plant

Steel Plant in Brazil. Approximate location -22.89986, -45.35034.

Steel PlantBrazilCO₂ reported

Gerdau Pindamonhangaba steel plant is a steel plant in Brazil with a reported capacity of 530,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Gerdau SA. By capacity it ranks #19 of 22 steel plants tracked in Brazil. It emits about 321,349 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 74,907 cars. Its CO₂ per unit of capacity is about 12% above the median steel plant.

530,000t of steel
321,349t CO₂e / yr (Climate TRACE)
#89CO₂ rank in Brazil
0.61t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566466.

文脈内で:この施設がどのように比較されるか

530,000 t of steelで、Gerdau Pindamonhangaba steel plantはBrazilのsteel plantの中央値以下 1,000,000 t of steelです。 容量あたりのCO₂は、steel plantの中央値上約8%です。 サブセクター:iron-and-steel。 steel plantとして、その中核的な産業操業に対して激しいプロセス熱(通常800–1500°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 製鉄所は高炉で石炭を燃焼させるか、電気アークを使用してスクラップを溶融します。どちらの場合でも溶融金属は1,500°C以上に保つ必要があり、広範な高温配管および容器を通じて転送されます。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 321,349 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

74,907cars driven for a year
41,908homes' annual energy use
5,355,817tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Brazil

ArcelorMittal Tubarão steel plant: 7,500,000 t of steel7.5MArcelorMit…CSN Volta Redonda steel plant: 6,251,000 t of steel6.3MCSN Volta …Ternium Brasil Santa Cruz steel plant: 5,200,000 t of steel5.2MTernium Br…Usiminas Ipatinga steel plant: 5,000,000 t of steel5.0MUsiminas I…Gerdau Açominas Ouro Branco steel plant: 4,360,000 t of steel4.4MGerdau Aço…ArcelorMittal Pecém steel plant: 3,000,000 t of steel3.0MArcelorMit…ArcelorMittal Monlevade steel plant: 1,200,000 t of steel1.2MArcelorMit…ArcelorMittal Piracicaba steel plant: 1,100,000 t of steel1.1MArcelorMit…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Gerdau SA. All facilities by this operator →

Local climate

Gerdau Pindamonhangaba steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 22.9°S in the southern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #19 largest of 22 steel plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -22.89986, -45.35034. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Gerdau Pindamonhangaba steel plant?

Gerdau Pindamonhangaba steel plant is a steel plant in Brazil. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Gerdau Pindamonhangaba steel plant?

Gerdau Pindamonhangaba steel plant has a reported capacity of 530,000 t of steel.

How much CO₂ does Gerdau Pindamonhangaba steel plant emit?

Gerdau Pindamonhangaba steel plant emits about 321,349 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 74,907 cars. That ranks #89 among tracked facilities in Brazil.

Where is Gerdau Pindamonhangaba steel plant located?

Gerdau Pindamonhangaba steel plant is in Brazil, near coordinates -22.89986, -45.35034.

Who operates Gerdau Pindamonhangaba steel plant?

Gerdau Pindamonhangaba steel plant is operated by Gerdau SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.