Home / Europe / Serbia / Food & beverage plants / Fabrika Secera Backa

Fabrika Secera Backa

Food & Beverage in Serbia. Approximate location 45.34, 19.4.

Food & BeverageSerbiaCO₂ reported

Fabrika Secera Backa is a food & beverage plant in Serbia with a reported capacity of 708,750,000 USD. It processes food, beverages or tobacco — typically with boilers, cookers and dryers. By capacity it ranks #12 of 12 food & beverage plants tracked in Serbia. It emits about 30,388 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,083 cars. Its CO₂ per unit of capacity is about 47% below the median food & beverage plant.

708,750,000USD
30,388t CO₂e / yr (Climate TRACE)
#18CO₂ rank in Serbia
0.00t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38480850.

文脈内で:この施設がどのように比較されるか

708,750,000 USDで、Fabrika Secera BackaはSerbiaのfood & beverage plantの中央値約 708,750,000 USDです。 サブセクター:food-beverage-tobacco。 food & beverage plantとして、その中核的な産業操業に対して激しいプロセス熱(通常80–200°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 食品および飲料工場は、継続的に動作するボイラー、調理器、殺菌機および乾燥機を使用します。未断熱配管および容器からの熱損失は、スループットおよび効率に直接影響します。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 30,388 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

7,083cars driven for a year
3,963homes' annual energy use
506,467tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest food & beverage plants in Serbia

Victoriaoil Doo Šid: 708,750,000 USD708.8MVictoriaoi…Proizvodni Centar Vrbas: 708,750,000 USD708.8MProizvodni…Proizvodni Centar Pećinci: 708,750,000 USD708.8MProizvodni…Fabrika Secera Crvenka: 708,750,000 USD708.8MFabrika Se…Fabrika Secera Te-To Senta: 708,750,000 USD708.8MFabrika Se…Sojaprotein: 708,750,000 USD708.8MSojaproteinFabrika Šećera Crvenka: 708,750,000 USD708.8MFabrika Še…Sojaprotein: 708,750,000 USD708.8MSojaprotein

Reported capacity (USD), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Fabrika Secera Backa sits in a temperate oceanic climate zone (Köppen Cfb), at 45.3°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #12 largest of 12 food & beverage plants in Serbia by reported capacity.

Nearby industrial sites

Location

Coordinates 45.34, 19.4. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Fabrika Secera Backa?

Fabrika Secera Backa is a food & beverage plant in Serbia. It processes food, beverages or tobacco — typically with boilers, cookers and dryers.

What is the capacity of Fabrika Secera Backa?

Fabrika Secera Backa has a reported capacity of 708,750,000 USD.

How much CO₂ does Fabrika Secera Backa emit?

Fabrika Secera Backa emits about 30,388 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,083 cars. That ranks #18 among tracked facilities in Serbia.

Where is Fabrika Secera Backa located?

Fabrika Secera Backa is in Serbia, near coordinates 45.34, 19.4.

Built from open public data; no personal information. Operate this site? Request a correction or removal.