Home / Asia / United Arab Emirates / Steel plants / Emsteel Abu Dhabi plant

Emsteel Abu Dhabi plant

Steel Plant in United Arab Emirates. Approximate location 24.32207, 54.46516.

Steel PlantUnited Arab EmiratesCO₂ reported

Emsteel Abu Dhabi plant is a steel plant in United Arab Emirates with a reported capacity of 3,600,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Emsteel Building Materials PJSC. By capacity it ranks #1 of 2 steel plants tracked in United Arab Emirates. It emits about 2,617,390 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 610,114 cars. Its CO₂ per unit of capacity is about 35% above the median steel plant.

3,600,000t of steel
2,617,390t CO₂e / yr (Climate TRACE)
#5CO₂ rank in United Arab Emirates
0.73t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566423.

文脈内で:この施設がどのように比較されるか

3,600,000 t of steelで、Emsteel Abu Dhabi plantはUnited Arab Emiratesのsteel plantの中央値約 3,600,000 t of steelです。 容量あたりのCO₂は、steel plantの中央値下約52%です。 サブセクター:iron-and-steel。 steel plantとして、その中核的な産業操業に対して激しいプロセス熱(通常800–1500°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 製鉄所は高炉で石炭を燃焼させるか、電気アークを使用してスクラップを溶融します。どちらの場合でも溶融金属は1,500°C以上に保つ必要があり、広範な高温配管および容器を通じて転送されます。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 2,617,390 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

610,114cars driven for a year
341,339homes' annual energy use
43,623,167tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in United Arab Emirates

Emsteel Abu Dhabi plant: 3,600,000 t of steel3.6MEmsteel Ab…Arabian Gulf Steel Industries Abu Dhabi plant: 1,200,000 t of steel1.2MArabian Gu…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Emsteel Building Materials PJSC. All facilities by this operator →

Local climate

Emsteel Abu Dhabi plant sits in a hot desert climate zone (Köppen BWh), at 24.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 2 steel plants in United Arab Emirates by reported capacity.

Nearby industrial sites

Location

Coordinates 24.32207, 54.46516. View on OpenStreetMap.

Heat loss & insulation profile

A steel plant like this runs hot equipment that sheds heat continuously: reheat & annealing furnaces, ladles, hot-blast stoves, steam & gas ducting (surface/process temperatures around 200–1,200 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 5,300 MWh/yr (≈ 1,800 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Emsteel Abu Dhabi plant?

Emsteel Abu Dhabi plant is a steel plant in United Arab Emirates. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Emsteel Abu Dhabi plant?

Emsteel Abu Dhabi plant has a reported capacity of 3,600,000 t of steel.

How much CO₂ does Emsteel Abu Dhabi plant emit?

Emsteel Abu Dhabi plant emits about 2,617,390 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 610,114 cars. That ranks #5 among tracked facilities in United Arab Emirates.

Where is Emsteel Abu Dhabi plant located?

Emsteel Abu Dhabi plant is in United Arab Emirates, near coordinates 24.32207, 54.46516.

Who operates Emsteel Abu Dhabi plant?

Emsteel Abu Dhabi plant is operated by Emsteel Building Materials PJSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.