Home / Türkiye / Steel plants / Asil Celik Orhangazi steel plant

Asil Celik Orhangazi steel plant

Steel Plant in Türkiye. Approximate location 40.42728, 29.27012.

Steel PlantTürkiyeCO₂ reported

Asil Celik Orhangazi steel plant is a steel plant in Türkiye with a reported capacity of 730,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Asil Celik Sanayi ve Ticaret AŞ. By capacity it ranks #25 of 26 steel plants tracked in Türkiye. It emits about 37,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,807 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.

730,000t of steel
37,784t CO₂e / yr (Climate TRACE)
#93CO₂ rank in Türkiye
0.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567084.

文脈内で:この施設がどのように比較されるか

730,000 t of steelで、Asil Celik Orhangazi steel plantはTürkiyeのsteel plantの中央値以下 1,400,000 t of steelです。 容量あたりのCO₂は、steel plantの中央値下約45%です。 サブセクター:iron-and-steel。 steel plantとして、その中核的な産業操業に対して激しいプロセス熱(通常800–1500°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 製鉄所は高炉で石炭を燃焼させるか、電気アークを使用してスクラップを溶融します。どちらの場合でも溶融金属は1,500°C以上に保つ必要があり、広範な高温配管および容器を通じて転送されます。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 37,784 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

8,807cars driven for a year
4,927homes' annual energy use
629,733tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Türkiye

Isdemir Payas steel plant: 5,800,000 t of steel5.8MIsdemir Pa…İÇDAŞ Biga steel plant: 5,001,000 t of steel5.0MİÇDAŞ Biga…Colakoglu Metallurgical Dilovasi plant: 4,500,000 t of steel4.5MColakoglu …Habas Aliaga steel plant: 4,500,000 t of steel4.5MHabas Alia…Toscelik Iskenderun steel plant: 4,000,000 t of steel4.0MToscelik I…Erdemir Eregli steel plant: 3,801,000 t of steel3.8MErdemir Er…Kardemir Merkez steel plant: 3,501,000 t of steel3.5MKardemir M…MMK Türkiye Metallurgical Payas plant: 2,500,000 t of steel2.5MMMK Türkiy…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Asil Celik Sanayi ve Ticaret AŞ. All facilities by this operator →

Local climate

Asil Celik Orhangazi steel plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 40.4°N in the northern hemisphere.

~14°Ctypical annual mean
~21°Ctypical warm-season
Warm-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #25 largest of 26 steel plants in Türkiye by reported capacity.

Nearby industrial sites

Location

Coordinates 40.42728, 29.27012. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Asil Celik Orhangazi steel plant?

Asil Celik Orhangazi steel plant is a steel plant in Türkiye. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Asil Celik Orhangazi steel plant?

Asil Celik Orhangazi steel plant has a reported capacity of 730,000 t of steel.

How much CO₂ does Asil Celik Orhangazi steel plant emit?

Asil Celik Orhangazi steel plant emits about 37,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 8,807 cars. That ranks #93 among tracked facilities in Türkiye.

Where is Asil Celik Orhangazi steel plant located?

Asil Celik Orhangazi steel plant is in Türkiye, near coordinates 40.42728, 29.27012.

Who operates Asil Celik Orhangazi steel plant?

Asil Celik Orhangazi steel plant is operated by Asil Celik Sanayi ve Ticaret AŞ.

Built from open public data; no personal information. Operate this site? Request a correction or removal.