Home / Asia / Iran / Steel plants / Arvand Jahanara Steel Khouzestan plant

Arvand Jahanara Steel Khouzestan plant

Steel Plant in Iran. Approximate location 30.50546, 48.27202.

Steel PlantIranCO₂ reported

Arvand Jahanara Steel Khouzestan plant is a steel plant in Iran with a reported capacity of 2,700,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Arvand Jahanara Steel Co. By capacity it ranks #4 of 23 steel plants tracked in Iran. It emits about 532,260 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 124,070 cars. Its CO₂ per unit of capacity is about 64% below the median steel plant.

2,700,000t of steel
532,260t CO₂e / yr (Climate TRACE)
#81CO₂ rank in Iran
0.20t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566881.

文脈内で:この施設がどのように比較されるか

2,700,000 t of steelで、Arvand Jahanara Steel Khouzestan plantはIranのsteel plantの中央値はるかに上 1,400,000 t of steelです。 容量あたりのCO₂は、steel plantの中央値下約73%です。 サブセクター:iron-and-steel。 steel plantとして、その中核的な産業操業に対して激しいプロセス熱(通常800–1500°C)が必要です。この熱はボイラー、炉、または直接燃焼によって供給される必要があり、未断熱容器および配管からの損失は無駄な燃料を表します。モジュール式脱着可能な断熱は、これらの損失を80~96%削減でき、表面を≤45°Cに冷却でき、回収期間は通常2年未満です。 製鉄所は高炉で石炭を燃焼させるか、電気アークを使用してスクラップを溶融します。どちらの場合でも溶融金属は1,500°C以上に保つ必要があり、広範な高温配管および容器を通じて転送されます。

容量およびCO₂強度の比較はClimate TRACEの産業施設データから計算されました。セクターの役割は工学リファレンスに基づいています。

What 532,260 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

124,070cars driven for a year
69,413homes' annual energy use
8,871,000tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Iran

Mobarakeh Steel Complex Isfahan: 10,000,000 t of steel10.0MMobarakeh …Esfahan Steel Isfahan plant: 3,600,000 t of steel3.6MEsfahan St…Khouzestan Steel plant: 3,600,000 t of steel3.6MKhouzestan…Arvand Jahanara Steel Khouzestan plant: 2,700,000 t of steel2.7MArvand Jah…Kish South Kaveh Steel Hormuzgan plant: 2,400,000 t of steel2.4MKish South…West Alborz Ana Steel Zanjan plant: 1,600,000 t of steel1.6MWest Albor…Mobarakeh Saba Steel Complex: 1,600,000 t of steel1.6MMobarakeh …Zarand Iranian Steel Company Kerman plant: 1,500,000 t of steel1.5MZarand Ira…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Arvand Jahanara Steel Co. All facilities by this operator →

Local climate

Arvand Jahanara Steel Khouzestan plant sits in a hot desert climate zone (Köppen BWh), at 30.5°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 23 steel plants in Iran by reported capacity.

Nearby industrial sites

Location

Coordinates 30.50546, 48.27202. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Arvand Jahanara Steel Khouzestan plant?

Arvand Jahanara Steel Khouzestan plant is a steel plant in Iran. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Arvand Jahanara Steel Khouzestan plant?

Arvand Jahanara Steel Khouzestan plant has a reported capacity of 2,700,000 t of steel.

How much CO₂ does Arvand Jahanara Steel Khouzestan plant emit?

Arvand Jahanara Steel Khouzestan plant emits about 532,260 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 124,070 cars. That ranks #81 among tracked facilities in Iran.

Where is Arvand Jahanara Steel Khouzestan plant located?

Arvand Jahanara Steel Khouzestan plant is in Iran, near coordinates 30.50546, 48.27202.

Who operates Arvand Jahanara Steel Khouzestan plant?

Arvand Jahanara Steel Khouzestan plant is operated by Arvand Jahanara Steel Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.