Cement Plant in Spain. Approximate location 39.66399, -0.24756.
Cement PlantSpainCO₂ reported
Villaluenga de la Sagra Cement Plant is a cement plant in Spain with a reported capacity of 2,350,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim España SAU. By capacity it ranks #3 of 29 cement plants tracked in Spain. It emits about 933,829 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 217,676 cars. Its CO₂ per unit of capacity is about 10% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438413.
Con 2,350,000 t of cement, Villaluenga de la Sagra Cement Plant è ben al di sopra di la mediana di cement plant in Spain (1,361,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 38% al di sopra di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim España SAU. All facilities by this operator →
Villaluenga de la Sagra Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 29 cement plants in Spain by reported capacity.
Coordinates 39.66399, -0.24756. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Villaluenga de la Sagra Cement Plant is a cement plant in Spain. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Villaluenga de la Sagra Cement Plant has a reported capacity of 2,350,000 t of cement.
Villaluenga de la Sagra Cement Plant emits about 933,829 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 217,676 cars. That ranks #15 among tracked facilities in Spain.
Villaluenga de la Sagra Cement Plant is in Spain, near coordinates 39.66399, -0.24756.
Villaluenga de la Sagra Cement Plant is operated by Holcim España SAU.