Cement Plant in Argentina. Approximate location -36.99377, -60.27575.
Cement PlantArgentinaCO₂ reported
Villa Fortabat Cement Plant is a cement plant in Argentina with a reported capacity of 1,600,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Loma Negra Compania Industrial Argentina SA. By capacity it ranks #5 of 10 cement plants tracked in Argentina. It emits about 551,151 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 128,473 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895117.
Con 1,600,000 t of cement, Villa Fortabat Cement Plant è attorno a la mediana di cement plant in Argentina (1,600,000 t of cement). Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Loma Negra Compania Industrial Argentina SA. All facilities by this operator →
Villa Fortabat Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 37.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 10 cement plants in Argentina by reported capacity.
Coordinates -36.99377, -60.27575. View on OpenStreetMap.
A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.
60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.
On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 11,000 MWh/yr (≈ 3,800 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.
See Inzonex insulation → Estimate your site →
Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.
Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.
Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:
Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.
Villa Fortabat Cement Plant is a cement plant in Argentina. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Villa Fortabat Cement Plant has a reported capacity of 1,600,000 t of cement.
Villa Fortabat Cement Plant emits about 551,151 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 128,473 cars. That ranks #12 among tracked facilities in Argentina.
Villa Fortabat Cement Plant is in Argentina, near coordinates -36.99377, -60.27575.
Villa Fortabat Cement Plant is operated by Loma Negra Compania Industrial Argentina SA.