Home / Asia / Nepal / Cement plants / Sonapur Cement Bijauri Cement Plant

Sonapur Cement Bijauri Cement Plant

Cement Plant in Nepal. Approximate location 28.09007, 82.37896.

Cement PlantNepalCO₂ reported

Sonapur Cement Bijauri Cement Plant is a cement plant in Nepal with a reported capacity of 839,500 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Sonapur Cements Pvt Ltd. By capacity it ranks #10 of 24 cement plants tracked in Nepal. It emits about 424,205 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 98,882 cars. Its CO₂ per unit of capacity is about 40% above the median cement plant.

839,500t of cement
424,205t CO₂e / yr (Climate TRACE)
#7CO₂ rank in Nepal
0.51t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897592.

Nel contesto: come si confronta questo impianto

Con 839,500 t of cement, Sonapur Cement Bijauri Cement Plant è attorno a la mediana di cement plant in Nepal (730,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 28% al di sopra di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 424,205 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

98,882cars driven for a year
55,321homes' annual energy use
7,070,083tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Nepal

Hongshi Shivam Cement Sardi Bagaicha Cement Plant: 2,300,000 t of cement2.3MHongshi Sh…CG Cement Palpa Cement Plant: 1,500,000 t of cement1.5MCG Cement …Samrat Dang Cement Plant: 1,314,000 t of cement1.3MSamrat Dan…Shaurya Cement Lahan Siraha Cement Plant: 1,277,500 t of cement1.3MShaurya Ce…Ghorahi Cement Laxmipur Cement Plant: 1,250,000 t of cement1.2MGhorahi Ce…Sarbottam Cement Sunwal Cement Plant: 1,095,000 t of cement1.1MSarbottam …Riddhi Siddhi Ratomate Cement Plant: 1,007,400 t of cement1.0MRiddhi Sid…Arghakhanchi Rupandehi Cement Plant: 1,000,000 t of cement1000kArghakhanc…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Sonapur Cements Pvt Ltd. All facilities by this operator →

Local climate

Sonapur Cement Bijauri Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 28.1°N in the northern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #10 largest of 24 cement plants in Nepal by reported capacity.

Nearby industrial sites

Location

Coordinates 28.09007, 82.37896. View on OpenStreetMap.

Heat loss & insulation profile

A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 10,000 MWh/yr (≈ 3,400 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Sonapur Cement Bijauri Cement Plant?

Sonapur Cement Bijauri Cement Plant is a cement plant in Nepal. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Sonapur Cement Bijauri Cement Plant?

Sonapur Cement Bijauri Cement Plant has a reported capacity of 839,500 t of cement.

How much CO₂ does Sonapur Cement Bijauri Cement Plant emit?

Sonapur Cement Bijauri Cement Plant emits about 424,205 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 98,882 cars. That ranks #7 among tracked facilities in Nepal.

Where is Sonapur Cement Bijauri Cement Plant located?

Sonapur Cement Bijauri Cement Plant is in Nepal, near coordinates 28.09007, 82.37896.

Who operates Sonapur Cement Bijauri Cement Plant?

Sonapur Cement Bijauri Cement Plant is operated by Sonapur Cements Pvt Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.