Home / Asia / Taiwan / Steel plants / Shyeh Sheng Fuat Steel Kaohsiung plant

Shyeh Sheng Fuat Steel Kaohsiung plant

Steel Plant in Taiwan. Approximate location 22.5601, 120.36646.

Steel PlantTaiwanCO₂ reported

Shyeh Sheng Fuat Steel Kaohsiung plant is a steel plant in Taiwan with a reported capacity of 720,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Shyeh Sheng Fuat Steel & Iron Works Co Ltd. By capacity it ranks #7 of 10 steel plants tracked in Taiwan. It emits about 166,691 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 38,856 cars. Its CO₂ per unit of capacity is about 57% below the median steel plant.

720,000t of steel
166,691t CO₂e / yr (Climate TRACE)
#16CO₂ rank in Taiwan
0.23t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567242.

Nel contesto: come si confronta questo impianto

Con 720,000 t of steel, Shyeh Sheng Fuat Steel Kaohsiung plant è al di sotto di la mediana di steel plant in Taiwan (1,000,000 t of steel). Il suo CO₂ per unità di capacità è approssimativamente 11% al di sopra di la mediana di steel plant. Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 166,691 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

38,856cars driven for a year
21,739homes' annual energy use
2,778,183tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Taiwan

China Steel Corporation Xiaogang plant: 10,000,000 t of steel10.0MChina Stee…China Steel Dragon Steel Taichung plant: 6,081,000 t of steel6.1MChina Stee…Feng Hsin Steel Taichung plant: 1,701,000 t of steel1.7MFeng Hsin …Tung Ho Steel Miaoli Plant: 1,200,000 t of steel1.2MTung Ho St…Tung Ho Steel Taoyuan Plant: 1,000,000 t of steel1000kTung Ho St…Yieh United Steel Kaohsiung plant: 1,000,000 t of steel1000kYieh Unite…Shyeh Sheng Fuat Steel Kaohsiung plant: 720,000 t of steel720kShyeh Shen…Tung Ho Steel Kaohsiung Plant: 700,000 t of steel700kTung Ho St…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Shyeh Sheng Fuat Steel & Iron Works Co Ltd. All facilities by this operator →

Local climate

Shyeh Sheng Fuat Steel Kaohsiung plant sits in a tropical monsoon climate zone (Köppen Am), at 22.6°N in the northern hemisphere.

~26°Ctypical annual mean
~28°Ctypical warm-season
Tropical monsoon: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #7 largest of 10 steel plants in Taiwan by reported capacity.

Nearby industrial sites

Location

Coordinates 22.5601, 120.36646. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Shyeh Sheng Fuat Steel Kaohsiung plant?

Shyeh Sheng Fuat Steel Kaohsiung plant is a steel plant in Taiwan. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Shyeh Sheng Fuat Steel Kaohsiung plant?

Shyeh Sheng Fuat Steel Kaohsiung plant has a reported capacity of 720,000 t of steel.

How much CO₂ does Shyeh Sheng Fuat Steel Kaohsiung plant emit?

Shyeh Sheng Fuat Steel Kaohsiung plant emits about 166,691 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 38,856 cars. That ranks #16 among tracked facilities in Taiwan.

Where is Shyeh Sheng Fuat Steel Kaohsiung plant located?

Shyeh Sheng Fuat Steel Kaohsiung plant is in Taiwan, near coordinates 22.5601, 120.36646.

Who operates Shyeh Sheng Fuat Steel Kaohsiung plant?

Shyeh Sheng Fuat Steel Kaohsiung plant is operated by Shyeh Sheng Fuat Steel & Iron Works Co Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.