Home / Europe / Germany / Steel plants / Riva Brandenburg Electric Steel Works

Riva Brandenburg Electric Steel Works

Steel Plant in Germany. Approximate location 52.403, 12.50164.

Steel PlantGermanyCO₂ reported

Riva Brandenburg Electric Steel Works is a steel plant in Germany with a reported capacity of 1,800,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by BES Brandenburger Elektrostahlwerke GmbH. By capacity it ranks #9 of 19 steel plants tracked in Germany. It emits about 107,661 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 25,096 cars. Its CO₂ per unit of capacity is about 89% below the median steel plant.

1,800,000t of steel
107,661t CO₂e / yr (Climate TRACE)
#145CO₂ rank in Germany
0.06t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566780.

Nel contesto: come si confronta questo impianto

Con 1,800,000 t of steel, Riva Brandenburg Electric Steel Works è ben al di sopra di la mediana di steel plant in Germany (1,400,000 t of steel). Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 107,661 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

25,096cars driven for a year
14,040homes' annual energy use
1,794,350tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Germany

ThyssenKrupp Steel Duisburg steel plant: 11,000,000 t of steel11.0MThyssenKru…Hüttenwerke Krupp Mannesmann (HKM) steel plant: 6,300,000 t of steel6.3MHüttenwerk…Salzgitter Flachstahl steel plant: 5,200,000 t of steel5.2MSalzgitter…ArcelorMittal Bremen steel plant: 3,800,000 t of steel3.8MArcelorMit…Saarstahl Völklingen Steelmaking Plant: 3,240,000 t of steel3.2MSaarstahl …AG der Dillinger Hüttenwerke Dillingen steel plant: 2,760,000 t of steel2.8MAG der Dil…Kehler Baden Steel Works: 2,500,000 t of steel2.5MKehler Bad…ArcelorMittal Eisenhüttenstadt steel plant: 2,400,000 t of steel2.4MArcelorMit…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by BES Brandenburger Elektrostahlwerke GmbH. All facilities by this operator →

Local climate

Riva Brandenburg Electric Steel Works sits in a temperate oceanic climate zone (Köppen Cfb), at 52.4°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #9 largest of 19 steel plants in Germany by reported capacity.

Nearby industrial sites

Location

Coordinates 52.403, 12.50164. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Riva Brandenburg Electric Steel Works?

Riva Brandenburg Electric Steel Works is a steel plant in Germany. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Riva Brandenburg Electric Steel Works?

Riva Brandenburg Electric Steel Works has a reported capacity of 1,800,000 t of steel.

How much CO₂ does Riva Brandenburg Electric Steel Works emit?

Riva Brandenburg Electric Steel Works emits about 107,661 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 25,096 cars. That ranks #145 among tracked facilities in Germany.

Where is Riva Brandenburg Electric Steel Works located?

Riva Brandenburg Electric Steel Works is in Germany, near coordinates 52.403, 12.50164.

Who operates Riva Brandenburg Electric Steel Works?

Riva Brandenburg Electric Steel Works is operated by BES Brandenburger Elektrostahlwerke GmbH.

Built from open public data; no personal information. Operate this site? Request a correction or removal.