Steel Plant in Russian Federation. Approximate location 56.84983, 59.90582.
Steel PlantRussian FederationCO₂ reported
Promsort Ural steel plant is a steel plant in Russian Federation with a reported capacity of 2,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Promsort LLC. By capacity it ranks #11 of 26 steel plants tracked in Russian Federation. It emits about 117,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 27,455 cars. Its CO₂ per unit of capacity is about 89% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567023.
Con 2,000,000 t of steel, Promsort Ural steel plant è ben al di sopra di la mediana di steel plant in Russian Federation (1,500,000 t of steel). Il suo CO₂ per unità di capacità è approssimativamente 58% al di sotto di la mediana di steel plant. Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Promsort LLC. All facilities by this operator →
Promsort Ural steel plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 56.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #11 largest of 26 steel plants in Russian Federation by reported capacity.
Coordinates 56.84983, 59.90582. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Promsort Ural steel plant is a steel plant in Russian Federation. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Promsort Ural steel plant has a reported capacity of 2,000,000 t of steel.
Promsort Ural steel plant emits about 117,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 27,455 cars. That ranks #162 among tracked facilities in Russian Federation.
Promsort Ural steel plant is in Russian Federation, near coordinates 56.84983, 59.90582.
Promsort Ural steel plant is operated by Promsort LLC.