Home / Asia / Indonesia / Pulp & paper mills / P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory

Pulp & Paper Mill in Indonesia. Approximate location 5.18116, 97.14132.

Pulp & Paper MillIndonesiaCO₂ reported

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory is a pulp & paper mill in Indonesia with a reported capacity of 858,213 t of pulp & paper. It turns wood or recovered fibre into pulp and paper, with large steam and drying loads. It is operated by PT Pabrik Kertas Tjiwi Kimia Tbk. By capacity it ranks #5 of 14 pulp & paper mills tracked in Indonesia. It emits about 463,799 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 108,112 cars.

858,213t of pulp & paper
463,799t CO₂e / yr (Climate TRACE)
#41CO₂ rank in Indonesia
0.54t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-44375555.

Nel contesto: come si confronta questo impianto

Con 858,213 t of pulp & paper, P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory è attorno a la mediana di pulp & paper mill in Indonesia (858,213 t of pulp & paper). Sottosettore: pulp-and-paper. Come pulp & paper mill, richiede calore di processo intenso (tipicamente 150–250°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cartiere generano il proprio vapore per il processo di polpa e gli essiccatori di carta, gestendo grandi sistemi di caldaie dove la perdita di calore riduce direttamente l'efficienza.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 463,799 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

108,112cars driven for a year
60,485homes' annual energy use
7,729,983tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest pulp & paper mills in Indonesia

IKPP P.T. Indah Kiat Pulp & Paper TbK - Tangerang Mill: 1,500,000 t of pulp & paper1.5MIKPP P.T. …IKPP P.T. Indah Kiat Pulp & Paper TbK - Serang Mill: 1,500,000 t of pulp & paper1.5MIKPP P.T. …P.T. Lontar Papyrus Pulp & Paper Industries - Jambi Mill: 997,900 t of pulp & paper998kP.T. Lonta…APP Oki Pulp Mill: 858,213 t of pulp & paper858kAPP Oki Pu…P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory: 858,213 t of pulp & paper858kP.T. Kerta…Riau Andalan Pulp & Paper P.T. - Riaupulp / Riaupaper Pulp Mill: 858,213 t of pulp & paper858kRiau Andal…P.T. Pakerin: 858,213 t of pulp & paper858kP.T. Paker…P.T. Pola Pulpindo Mantap: 858,213 t of pulp & paper858kP.T. Pola …

Reported capacity (t of pulp & paper), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by PT Pabrik Kertas Tjiwi Kimia Tbk. All facilities by this operator →

Local climate

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory sits in a tropical rainforest climate zone (Köppen Af), at 5.2°N in the northern hemisphere.

~26°Ctypical annual mean
~27°Ctypical warm-season
Tropical rainforest: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 14 pulp & paper mills in Indonesia by reported capacity.

Location

Coordinates 5.18116, 97.14132. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory?

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory is a pulp & paper mill in Indonesia. It turns wood or recovered fibre into pulp and paper, with large steam and drying loads.

What is the capacity of P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory?

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory has a reported capacity of 858,213 t of pulp & paper.

How much CO₂ does P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory emit?

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory emits about 463,799 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 108,112 cars. That ranks #41 among tracked facilities in Indonesia.

Where is P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory located?

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory is in Indonesia, near coordinates 5.18116, 97.14132.

Who operates P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory?

P.T. Kertas Kraft Aceh (Persero) - Head Office and Factory is operated by PT Pabrik Kertas Tjiwi Kimia Tbk.

Built from open public data; no personal information. Operate this site? Request a correction or removal.