Home / Europe / Spain / Cement plants / Oural Cement Plant

Oural Cement Plant

Cement Plant in Spain. Approximate location 42.71711, -7.45068.

Cement PlantSpainCO₂ reported

Oural Cement Plant is a cement plant in Spain with a reported capacity of 650,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Votorantim Cimentos SA. By capacity it ranks #28 of 29 cement plants tracked in Spain. It emits about 152,863 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 35,632 cars. Its CO₂ per unit of capacity is about 35% below the median cement plant.

650,000t of cement
152,863t CO₂e / yr (Climate TRACE)
#58CO₂ rank in Spain
0.24t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896738.

Nel contesto: come si confronta questo impianto

Con 650,000 t of cement, Oural Cement Plant è al di sotto di la mediana di cement plant in Spain (1,361,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 18% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 152,863 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

35,632cars driven for a year
19,935homes' annual energy use
2,547,717tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Spain

El Alto Cement Plant: 2,900,000 t of cement2.9MEl Alto Ce…Aboño Cement Plant: 2,400,000 t of cement2.4MAboño Ceme…Villaluenga de la Sagra Cement Plant: 2,350,000 t of cement2.3MVillalueng…Alcanar Cement Plant: 2,185,000 t of cement2.2MAlcanar Ce…Sagunto Cement Plant: 1,800,000 t of cement1.8MSagunto Ce…Monjos Cement Plant: 1,800,000 t of cement1.8MMonjos Cem…Sant Vicent dels Horts Cement Plant: 1,780,000 t of cement1.8MSant Vicen…Castillejo Cement Plant: 1,730,000 t of cement1.7MCastillejo…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Votorantim Cimentos SA. All facilities by this operator →

Local climate

Oural Cement Plant sits in a warm-summer Mediterranean climate zone (Köppen Csb), at 42.7°N in the northern hemisphere.

~14°Ctypical annual mean
~21°Ctypical warm-season
Warm-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #28 largest of 29 cement plants in Spain by reported capacity.

Nearby industrial sites

Location

Coordinates 42.71711, -7.45068. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Oural Cement Plant?

Oural Cement Plant is a cement plant in Spain. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Oural Cement Plant?

Oural Cement Plant has a reported capacity of 650,000 t of cement.

How much CO₂ does Oural Cement Plant emit?

Oural Cement Plant emits about 152,863 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 35,632 cars. That ranks #58 among tracked facilities in Spain.

Where is Oural Cement Plant located?

Oural Cement Plant is in Spain, near coordinates 42.71711, -7.45068.

Who operates Oural Cement Plant?

Oural Cement Plant is operated by Votorantim Cimentos SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.