Cement Plant in Tanzania. Approximate location -10.2589, 40.04132.
Cement PlantTanzaniaCO₂ reported
Mtwara Cement Plant is a cement plant in Tanzania with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Dangote Cement PLC. By capacity it ranks #1 of 6 cement plants tracked in Tanzania. It emits about 1,107,966 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 258,267 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897926.
Con 3,000,000 t of cement, Mtwara Cement Plant è ben al di sopra di la mediana di cement plant in Tanzania (1,100,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 22% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Dangote Cement PLC. All facilities by this operator →
Mtwara Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 10.3°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 6 cement plants in Tanzania by reported capacity.
Coordinates -10.2589, 40.04132. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Mtwara Cement Plant is a cement plant in Tanzania. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Mtwara Cement Plant has a reported capacity of 3,000,000 t of cement.
Mtwara Cement Plant emits about 1,107,966 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 258,267 cars. That ranks #1 among tracked facilities in Tanzania.
Mtwara Cement Plant is in Tanzania, near coordinates -10.2589, 40.04132.
Mtwara Cement Plant is operated by Dangote Cement PLC.