Home / North America / Canada / Manufacturing plants / Montreal Wallboard/Finishing Plant

Montreal Wallboard/Finishing Plant

Other Manufacturing in Canada. Approximate location 45.4045, -73.5889.

Other ManufacturingCanadaCO₂ reported

Montreal Wallboard/Finishing Plant is an other manufacturing in Canada with a reported capacity of 1 unitless. It runs heavy manufacturing processes (rubber, plastics and allied products). By capacity it ranks #11 of 21 manufacturing plants tracked in Canada. It emits about 32,737 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,631 cars.

1unitless
32,737t CO₂e / yr (Climate TRACE)
#143CO₂ rank in Canada
32737.00t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-3193739.

Nel contesto: come si confronta questo impianto

Con 1 unitless, Montreal Wallboard/Finishing Plant è attorno a la mediana di other manufacturing in Canada (1 unitless). Sottosettore: other-manufacturing. Come other manufacturing, richiede calore di processo intenso (tipicamente 100–600°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le strutture di manufattura pesante gestiscono una gamma di processi ad alto consumo termico (gomma, plastica, recipienti a pressione); mantenere il calore di processo in modo efficiente è critico per il controllo dei costi.

Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.

What 32,737 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

7,631cars driven for a year
4,269homes' annual energy use
545,617tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest manufacturing plants in Canada

Baymag Exshaw Operations: 1 unitless1Baymag Exs…ROXUL Inc.: 1 unitless1ROXUL Inc.CGC Hagersville Plant: 1 unitless1CGC Hagers…Brampton Brick Limited: 1 unitless1Brampton B…Brampton Brick: 1 unitless1Brampton B…Atlantic Wallboard: 1 unitless1Atlantic W…Atlantic Wallboard LP: 1 unitless1Atlantic W…Montreal Plant (024): 1 unitless1Montreal P…

Reported capacity (unitless), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Montreal Wallboard/Finishing Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 45.4°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #11 largest of 21 manufacturing plants in Canada by reported capacity.

Nearby industrial sites

Location

Coordinates 45.4045, -73.5889. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Montreal Wallboard/Finishing Plant?

Montreal Wallboard/Finishing Plant is a other manufacturing in Canada. It runs heavy manufacturing processes (rubber, plastics and allied products).

What is the capacity of Montreal Wallboard/Finishing Plant?

Montreal Wallboard/Finishing Plant has a reported capacity of 1 unitless.

How much CO₂ does Montreal Wallboard/Finishing Plant emit?

Montreal Wallboard/Finishing Plant emits about 32,737 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,631 cars. That ranks #143 among tracked facilities in Canada.

Where is Montreal Wallboard/Finishing Plant located?

Montreal Wallboard/Finishing Plant is in Canada, near coordinates 45.4045, -73.5889.

Built from open public data; no personal information. Operate this site? Request a correction or removal.