Cement Plant in Morocco. Approximate location 33.36726, -7.74863.
Cement PlantMoroccoCO₂ reported
Lafarge Settat Cement Plant 2 is a cement plant in Morocco with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by LafargeHolcim Maroc SA. By capacity it ranks #1 of 14 cement plants tracked in Morocco. It emits about 1,508,077 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 351,533 cars. Its CO₂ per unit of capacity is about 40% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897464.
Con 3,000,000 t of cement, Lafarge Settat Cement Plant 2 è ben al di sopra di la mediana di cement plant in Morocco (1,600,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 59% al di sopra di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by LafargeHolcim Maroc SA. All facilities by this operator →
Lafarge Settat Cement Plant 2 sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 33.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 14 cement plants in Morocco by reported capacity.
Coordinates 33.36726, -7.74863. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Lafarge Settat Cement Plant 2 is a cement plant in Morocco. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Lafarge Settat Cement Plant 2 has a reported capacity of 3,000,000 t of cement.
Lafarge Settat Cement Plant 2 emits about 1,508,077 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 351,533 cars. That ranks #1 among tracked facilities in Morocco.
Lafarge Settat Cement Plant 2 is in Morocco, near coordinates 33.36726, -7.74863.
Lafarge Settat Cement Plant 2 is operated by LafargeHolcim Maroc SA.