Cement Plant in Turkmenistan. Approximate location 38.25286, 57.6655.
Cement PlantTurkmenistanCO₂ reported
Kelete Cement Plant is a cement plant in Turkmenistan with a reported capacity of 686,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Ministry of Industry and Construction Production (Turkmenistan). By capacity it ranks #4 of 4 cement plants tracked in Turkmenistan. It emits about 677,628 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 157,955 cars. Its CO₂ per unit of capacity is about 174% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546987.
Con 686,000 t of cement, Kelete Cement Plant è al di sotto di la mediana di cement plant in Turkmenistan (2,000,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 64% al di sopra di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ministry of Industry and Construction Production (Turkmenistan). All facilities by this operator →
Kelete Cement Plant sits in a cold desert climate zone (Köppen BWk), at 38.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 4 cement plants in Turkmenistan by reported capacity.
Coordinates 38.25286, 57.6655. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Kelete Cement Plant is a cement plant in Turkmenistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Kelete Cement Plant has a reported capacity of 686,000 t of cement.
Kelete Cement Plant emits about 677,628 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 157,955 cars. That ranks #3 among tracked facilities in Turkmenistan.
Kelete Cement Plant is in Turkmenistan, near coordinates 38.25286, 57.6655.
Kelete Cement Plant is operated by Ministry of Industry and Construction Production (Turkmenistan).