Cement Plant in Bosnia and Herzegovina. Approximate location 44.11704, 18.11278.
Cement PlantBosnia and HerzegovinaCO₂ reported
Kakanj Cement Plant is a cement plant in Bosnia and Herzegovina with a reported capacity of 770,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Heidelberg Materials Cement BiH d.d. Kakanj. By capacity it ranks #1 of 2 cement plants tracked in Bosnia and Herzegovina. It emits about 430,400 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 100,326 cars. Its CO₂ per unit of capacity is about 55% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437261.
Con 770,000 t of cement, Kakanj Cement Plant è attorno a la mediana di cement plant in Bosnia and Herzegovina (770,000 t of cement). Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Heidelberg Materials Cement BiH d.d. Kakanj. All facilities by this operator →
Kakanj Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 2 cement plants in Bosnia and Herzegovina by reported capacity.
Coordinates 44.11704, 18.11278. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Kakanj Cement Plant is a cement plant in Bosnia and Herzegovina. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Kakanj Cement Plant has a reported capacity of 770,000 t of cement.
Kakanj Cement Plant emits about 430,400 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 100,326 cars. That ranks #2 among tracked facilities in Bosnia and Herzegovina.
Kakanj Cement Plant is in Bosnia and Herzegovina, near coordinates 44.11704, 18.11278.
Kakanj Cement Plant is operated by Heidelberg Materials Cement BiH d.d. Kakanj.