Steel Plant in Indonesia. Approximate location -6.27974, 107.11496.
Steel PlantIndonesiaCO₂ reported
Gunung Raja Paksi West Java steel plant is a steel plant in Indonesia with a reported capacity of 2,800,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by PT Gunung Raja Paksi Tbk. By capacity it ranks #4 of 8 steel plants tracked in Indonesia. It emits about 1,748,129 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 407,489 cars. Its CO₂ per unit of capacity is about 16% above the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32441187.
Con 2,800,000 t of steel, Gunung Raja Paksi West Java steel plant è attorno a la mediana di steel plant in Indonesia (2,800,000 t of steel). Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by PT Gunung Raja Paksi Tbk. All facilities by this operator →
Gunung Raja Paksi West Java steel plant sits in a tropical rainforest climate zone (Köppen Af), at 6.3°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 8 steel plants in Indonesia by reported capacity.
Coordinates -6.27974, 107.11496. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Gunung Raja Paksi West Java steel plant is a steel plant in Indonesia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Gunung Raja Paksi West Java steel plant has a reported capacity of 2,800,000 t of steel.
Gunung Raja Paksi West Java steel plant emits about 1,748,129 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 407,489 cars. That ranks #11 among tracked facilities in Indonesia.
Gunung Raja Paksi West Java steel plant is in Indonesia, near coordinates -6.27974, 107.11496.
Gunung Raja Paksi West Java steel plant is operated by PT Gunung Raja Paksi Tbk.