Steel Plant in Spain. Approximate location 38.32042, -6.71619.
Steel PlantSpainCO₂ reported
Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is a steel plant in Spain with a reported capacity of 1,300,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by AG Siderurgica Balboa SA. By capacity it ranks #5 of 14 steel plants tracked in Spain. It emits about 60,603 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,127 cars. Its CO₂ per unit of capacity is about 91% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566802.
Con 1,300,000 t of steel, Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant è attorno a la mediana di steel plant in Spain (1,200,000 t of steel). Il suo CO₂ per unità di capacità è approssimativamente 10% al di sotto di la mediana di steel plant. Sottosettore: iron-and-steel. Come steel plant, richiede calore di processo intenso (tipicamente 800–1500°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Gli impianti siderurgici bruciano carbone in altiforni o utilizzano archi elettrici per fondere rottami; in entrambi i casi, il metallo fuso deve essere mantenuto sopra i 1.500°C e trasferito attraverso estesi tubi e recipienti caldi.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by AG Siderurgica Balboa SA. All facilities by this operator →
Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 38.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 14 steel plants in Spain by reported capacity.
Coordinates 38.32042, -6.71619. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is a steel plant in Spain. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant has a reported capacity of 1,300,000 t of steel.
Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant emits about 60,603 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,127 cars. That ranks #78 among tracked facilities in Spain.
Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is in Spain, near coordinates 38.32042, -6.71619.
Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros steel plant is operated by AG Siderurgica Balboa SA.