Cement Plant in United Arab Emirates. Approximate location 25.55286, 56.22679.
Cement PlantUnited Arab EmiratesCO₂ reported
Fujairah Cement Plant is a cement plant in United Arab Emirates with a reported capacity of 2,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Fujairah Cement Industries PJSC. By capacity it ranks #7 of 12 cement plants tracked in United Arab Emirates. It emits about 561,921 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 130,984 cars. Its CO₂ per unit of capacity is about 35% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437206.
Con 2,400,000 t of cement, Fujairah Cement Plant è attorno a la mediana di cement plant in United Arab Emirates (2,700,000 t of cement). Il suo CO₂ per unità di capacità è approssimativamente 42% al di sotto di la mediana di cement plant. Sottosettore: cement. Come cement plant, richiede calore di processo intenso (tipicamente 800–1400°C) per le sue operazioni industriali essenziali — calore che deve essere fornito da caldaie, forni o combustione diretta, e le perdite attraverso recipienti e tubazioni non isolati rappresentano carburante sprecato. L'isolamento modulare removibile può ridurre queste perdite dell'80–96%, raffreddando superfici a ≤45°C, con payback spesso inferiore a 2 anni. Le cementerie riscaldano il calcare a 1.400°C in forni rotativi — uno dei processi industriali più caldi — e devono controllare la temperatura con precisione lungo l'intera lunghezza del forno.
Confronto di capacità e intensità di CO₂ calcolato dai dati delle strutture industriali Climate TRACE; ruolo del settore basato su riferimento ingegneristico.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Fujairah Cement Industries PJSC. All facilities by this operator →
Fujairah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 25.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #7 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.55286, 56.22679. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Fujairah Cement Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Fujairah Cement Plant has a reported capacity of 2,400,000 t of cement.
Fujairah Cement Plant emits about 561,921 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 130,984 cars. That ranks #19 among tracked facilities in United Arab Emirates.
Fujairah Cement Plant is in United Arab Emirates, near coordinates 25.55286, 56.22679.
Fujairah Cement Plant is operated by Fujairah Cement Industries PJSC.